Circulars/Acts/Rules/Orders

IMPORTANT RULES/ACTS/CIRCULARS/ NOTIFICATIONS/GUIDELINES

PW&FR  | GF&AR  | RTPP-ACT-2012  | RTPP-Rules-2013 )

Latest Circulars (2015-16 & 2016-17)

1. Directions for preparing final bill after calculating escalation on the basis of Excess/Saving (D-34 12-04-2016)
2. Directions for preparing final bill after calculating escalation(D-718 01-01-2016)
3. Directions for using Online LOC Module for sending demands of fund for Building Heads (D-1 11-04-2016)
4. Timeline in disposing of public grievances received directly or through MPs/ VIPs and VIP/Imporatnt Offices/email etc, (MOrD 1- 12-2015)
5. Directions for ignoring false calls/messages related to demand of money from unknown sources (30773 Dated 07-04- 2015)
6. Direction for preparing Crust Thickness proposals for Road Construction/Upgradation/Renewal after considering overloading capacity of passing vehicles(D-958 12-05-2015)
7. Circular for using official e-mail of Pr. Secretary PWD for submitting information about official activities by officers (D- 31268 Dated 24-04-2015)
8. Directions for carrying regular/sudden Inspections in the Government Departments (AR Dated : 11-03-2015)
9. Directions for proper examining of Bids in respect of proper documentations, procedure and Fee etc. (D-852 25-03-2015)
10. Diredctions for submitting all documents while sending the matter for examination of Account Wing (D-790 04-03-2015)
11. Directions for sending recommendation for action under CCA-16/17 after proper examination of available facts (10-02-2015)
12. Directions for leaving proper space on the note-sheet prior sending the file to higher authoroties (30019 Dated " 18-03-2015)
13. The Evaluation of work done by the Public Sector Undertakings of Government (Finance 01-06-2015)
14. Price Variation Clause Dt 15-6-2016
15. Additional performance security on un-balanced bids
16. Synthetic Polyester Triangular Fibers (Circular No.1/2015 dated 12.3.2015) Cell (D&T)
17. Higher Education (Distance Education Mode) Order dated 21.4.2015 Cell Sec-I(C)
18. Crust Disign Roads Circular No.2/2015-16 dated 12.5.2015 Cell (D&T)
19. Tender Documents Circular No.3/2015-16 dated 30.6.2015 Cell (D&T)
20. Regarding Bills Circular No.4/2015 dated 16.7.2015 Cell (D&T)
21. Regarding Contractors Circular dated 15.10.2015 Cell (Sec-XI)
22. Corrigendum for Circular of Synthetic Polyester Triangular Fiber Circular No.1/2015 dated 15.2.2016 Cell ((D&T)
23. Preparing for Flood Management During 2016 Circular No.5/2016-17 dated 26.5.2016 Cell (D&T)
24. Conditions for Proper Monitoring of Constriction Work Circular dated 13.6.2016 Cell (SE-Road)
25. Price variation Clause Circular dated 15.6.2016 Cell (Sec-XI)
26. Use of Steel TMT Re-Bar Circular dated 8.8.2016 Cell (D&T)
27. Rain Water Harvesting in Bldg. Circular dated 24.8.2016 Cell (D&T)

Building

1. Reasonable area of the built up space for officers, staff (Building Standing Order No.144 )
2. General Instructions to be followed while preparing detailed estimates. (Building Circular No. 19(Bldg. 6) )
3. Check-list for taking over newly construction bldg. from contractors. (Building Circular No. 36(Bldg. 6) )
4. Tender ceiling rates (Building Order No.SE(Road)/EE/ceiling rates /D-1115 dt.12.08.2002 )
5. Rain harvesting in Govt. Bldgs. (Building Circular dt.04.06.2005 )
6. Tender Processing (Building Order No.F8(6)PW/2004/5 dt.13.01.2006 )
7. Safety in Excavation work in Bldg. (Building Circular No. 1/2006 dt.29.05.2006 )
8. Circular for fair rent rates clarification (Building Circular of 2007 dt. 20.01.2007 )
9. Use of energy efficient lamps (Building Circular dt. 23.09.2008 )
10. Circular for Electrical Provision in Estimates (Building Circular of 2008 dt. 23.09.2008 )
11. Economy in Bldg. Construction. (Building Circular dt.13.07.2009 )
12. DLP (Building Order No.CE(Bldg.)DLP(Bldg. Works)/D-268 dt. 07.10.2009 )
13. Directions regarding improvement in Bldg Construction (Building Order No.PS/PS-PWD/10/D-728 dt. 03.05.2010 )
14. Additional Security (Building Order No.PS/PS-PWD/2011 dt.10.05.2011 )
15. Bldg Valuation (Building Standing Order No. X-3/2011 )
16. Selection of land/site for bldg. construction works (Building Circular dt. 30.01.2012 )
17. Tenders of Bldg. works (Building Circular dt.17.07.2012 )
18. Construction of Bldg. and culvert work (Building Circular dt. 20.07.2012 )
19. Rates of PWD Dak Banglows,Rest house, Inspections Banglows. (Building Order no.P.14(13)PW/2005 dt.08.08.2012 )
20. DLP (Building Order No. CE(Bldg.)/DLP(Bldg. works/D-837 dt. 10.09.2012 )
21. DLP (Building Order No.SE(SS)/DLP/2011-12/D-1045 dt.11.09.2012 )
22. DLP (Building Order No.CE(Bldg)/DLP(Bldg works)/D-980 dt.12.10.2012 )
23. Forecast Estimate (Building Order No.P.14(18)PW/2012 )
24. Use of Steel in bldg. works (Building Circular dt. 21.01.2013 )
25. Completion of Bldg. within Sanction amount (Building Circular No.1/2013 dt.20.03.2013 )
26. Adoption of green bldg. measures. (Building Circular of 2013 dt.04.06.2013 )
27. Provisional of air cooling/condition etc. in forecast estimates. (Building Circular of 2013 dt.04.06.2013 )
28. Demolition of unsafe Bldgs. (Building Order No.F.14(47)PW/2013 dt.05.09.2013 )
29. Repair and maintenance of Govt. Quarters (Building Circular dt. 03.01.2014 )
30. RTPP Rules 2013 (Building Order No. ACE(M)PWD/SPPP/13-14/D-915 dt. 06.01.2014 )
31. Safety during Barricading (Building Circular No.3 dt.28.01.2014 )
32. Fixing of Rain water pipe (Building Circulars dt.17.08.11 )
33. Falling of loose ceiling Plaster (Building Circulars dt.30.1.2012 )
34. Department of Social and Empowerment Department, handicapped accessible empowerment Department  guidelines regarding government building (Building Circulars dt.28.06.2016)
35. Revised Rate of Dak Banglow stay and rules dt 17.05.2016
36. Building BSR-2016 City Circle Jaipur dt 05.10.2016

Architect

1. Compliance of Minutes of the Meeting. (Architect Order Dt. 06.04.2002 )
2. Deviations in drawing. (Architect Order No. CA/PW/2012/D-3616 Dt. 01.02.2012 )

National Highways

1. Speed breakers on NH (NH Circular of Dt. 20.06.2003 )
2. Use of CRMB (NH Circular of Dt. 02.01.2004 )
3. Rain damages in NH (NH Circular of Dt. 08.06.2007 )
4. Km. Stone/200Mtr. Stone (NH Circular of Dt. 08.06.2007 )
5. CRF Road work (NH Circular of Dt. 01.01.2008 )
6. Road side plantation under CRF works. (NH Circular of Dt. 05.10.2009 )
7. Modification by Empowered Board (NH Order No. F-5(15)(177)Sec.-II/2009/D-45 Dt. 16.09.2010 )
8. Tendering Process and timely execution of works (NH Order No.SE(NH)/PA/EI/D-22.02.2011 )
9. DLP (NH Order No.SE(NH)/DLP-41/2012-13/D-1626 Dt. 06.12.2012 )
10. Prevention of Unauthorized advertisement Board/Hoardings on the roads (NH Circular of Dt. 04.05.2013 )
11. Permission for road cutting to Govt. department/undertaking (NH Order No.CE(NH)/Sr.PA/D-229 dt.12.06.2008 )

Special Schemes

1. Flood circular PWD 2016 Dated 26-5-2016
2. GOI mgnrega__pmgsy Convergence Circular  7 Nov 2013
3. NREGA mate employement order dt 19 Aug 2015
4. NREGS & PMGSY Convergence 9 Feb 2009 Circular
5. NREGS labour group measurement of work order 20  april 2016
6. NREGS labour rate order 11 may 2016
7. State Govt Nrega PWD convergence guidelines dated 8-5-2015
8. NAREGA Works (SS Circular dt.06.05.2009 )
9. To reduce damages in B/T Roads in rainy season (SS Circular dt.30.09.2010 )
10. NAREGA Works (SS Circular dt.22.05.2014 )
11. Flood management Works (SS Circular dt.30.05.2014 )
12. Hazard Safety Cell (SS Order No. CE(SS)/D-416 dt.11.11.2014 )
13. Nomination of Programme in NAREGA Works (SS Order No. SE(SS) 2014/D-430 dt.3.12.2014 )
14. NREGA Saral Mate Marg Darshika (Manual)
15 NREGA Task Pustika (Manual)
16. National Building Code 2005
17 Retrofitting-Guidelines
18. Earthquake Training manual Engineers NPCBEERM
19. Satte Govt Eartquake ordrs
20. Law and Legal Frame work
21. IS Code for Earthquake Engineering
22. Hazard Safety Cell Releief Dept  orders
23. Earthquakle Awarness materail

Quality Control

1. Duties of norms of testing officers. (QC Office Order No.F-21CE(SS)/PWD/EE(SI&QC)/09/D-2407 Dated 24-09-2009 )
2. Norms of QC test to be conducted by various officers. (QC Circular No.F5/CE (SS)/PWD/EE (SI&QC)/Cir/09/D2408 Dated 24-09-2009 )
3. Monitoring and action taken on substandard test reports.. (QC Office Order No.F-4CE(SS)/PWD/EE(SI&QC)/09D/2409 Dated 24-09-2009 )
4. For effective Control on PWD laboratories (QC Office Order No.F-21CE(SS)/PWD/EE(SI&QC)/Lab /09/D2410 Dated 24-09-2009 )
5. Work shop on Quality Control. (QC Office Order No.F-16CE(SS)/PWD/EE(SI&QC)/Cir/09/ D-2411 Dated 24-09-2009 )
6. Book about QC control (QC Letter No F-3/CE(SS)/EE(SI&QC)/09/D-486 Dated 11.12.2009 )
7. Quality Control measures. (QC Circular No. CE(SS)/EE(SI&QC)/2011/D-6 Dated 09-06-2011 )
8. Maintenance of Inspection book & QC register (QC Office Order No. F.45/P&M-II/Circular /05/D228 Dated 9-7-2010 )
9. Regarding Testing of material in Central/ Regional laboratories. (QC Office Order No.F-CE(SS)/EE(SI&QC)/D-37 Dated 21-07-2010 )
10. To link QC results with original agreement file. (QC Letter No CE(SS)/SI&QC/10-11/D-55 dt.14-9-10 )
11. Completion certificates (QC Letter No.CE(SS)SI&QC/10-11/D-56 Dated 14-9-2010 )
12. Action against poor QC results (QC Letter No CE(SS)EE(SI&QC)2010-11/D-57 dated 14-9-2010 )
13. Effective control of QC divisions (QC Letter No CE(SS)/SI&QC/2010/D-85 Dated 25-11-2010 )
14. Ensuring effective quality control on works. (QC Letter No No. CE(SS)EE(SI&QC)2010-11/D97 Dated 1-2-2011 )
15. Quality Control. (QC Circular No.F3CE(SS)/EE(SI&QC)/2011/1) Dated 9-3-2011 )
16. Sequential procedure for finalization of ATRs. (QC Letter No Dated 28-03-2011/Udaipur )
17. Utilization of 1% provision in sanctioned amount for quality control works. (QC Letter No No. F-3/CE(SS)/EE(SI&QC)/2011/D-1 Dated 13-4-2011 )
18. Establishment/ verification of field Laboratory. (QC Letter No No. SE (SS)/Q.C./ 81 Dated 9-8-11 )
19. Administrative control of EESI&QC. (QC Office Order CE(SS)/EE(SI&QC)/D-97 Dated 02.03.2012 )

Electrical

1. Duties of ACE (Elect Order No.F.1(32)PW/2011 dt.23.04.2012 )
2. Bid for Electrical Works (Elect Order No.136 dt.23.05.2013 )
3. Forecast Estimates (Elect Circular dt.04.06.2013 )
4. Adoption of Green Bldg. Measures (Elect Circular dt.04.06.2013 )
5. Forecast Estimates (Elect Circular dt.06.08.2013 )

Legal Cell

1. Directions By Hon'ble CM about work disposal by AAG Dated 29.08.2016
2. Instructions By Hon'ble CS regarding inter deparmental disputes Dated 31.08.2016
3. कार्यालयों के गठन, आमेलन अथवा समाप्‍त किये जाने के उपरान्‍त न्‍यायिक प्रकरणों की पत्रावलियों के संधारण हेतु आदेश दिनांक 20/8/2016
4. मा0 उच्‍च न्‍यायालय में अपील/रिट पर स्‍थगन आदेश/अंतरिम आदेशों के क्रम में परिपत्र दिनांक 20/9/2016 

Roads

1. Mix- Material of bitumen (Road Circular No. 16/2002 dt.22.07.2002 )
2. Use of Mineral Waste/Over burden in construction of Bldgs. (Road Circular No. 1/2005-06 dt.02.04.2005 )
3. Const. of CC roads. (Road Circular No. 2/2005-06 dt.26.04.2005 )
4. Use of tack coat (Road Circular of 2005 dt. 25.11.2005 )
5. Use of Portland Pozzolana Cement (Road Circular No. 3/2006 dt.11.12.2006 )
6. Patch and shoulders repair. (Road Circular No. 1/2007-08 dt.05.05.2007 )
7. Target achievement. (Road Circular No. 2/2007-08 dt.05.05.2007 )
8. Construction of shoulders. (Road Circular No. 3/2007-08 dt.05.05.2007 )
9. Land Acquisition (Road Circular No. 4/2007-08 dt.05.05.2007 )
10. Excess / Extra items (Road Circular No. 9/2007 dt. 27.07.2007 )
11. Utilization certificate from RSRDCC (Road Circular No. 1/2007-08 dt.02.08.2007 )
12. Providing drainage (Road Circular No. 3/2007-08 dt.02.08.2007 )
13. S&I for CD works. (Road Circular No. 4/2007-08 dt.18.08.2007 )
14. Disposal of Rain water and repair of berms. (Road Circular No. 5/2007-08 dt.01.09.2007 )
15. Norms of QC (Road Circular No. 1/2008 dt.29.03.2008 )
16. Plantation on roads (Road Circular No. 7/2008-09 dt.06.05.2008 )
17. Road safety (Road Circular No. 10/2008-09 dt.12.02.2009 )
18. Encroachment in road boundary (Road Circular No. R-09/01dt.17.07.2009 )
19. Improvement of riding quality. (Road Circular No. 6/2007-08 dt.17.09.2009 )
20. Const. of CC Roads (Road Circular No. R-09/01 of 29.09.2009 )
21. Right of way and bldg.lines (Road Circular No. R-09/03 dt.01.10.2009 )
22. Const. of berms (Road Circular No. R-09/05 dt.11.12.2009 )
23. Position of various utilities on the road sides. (Road Circular No. R-4/2009 dt.22.12.2009 )
24. Construction Junction of roads in NAREGA Schemes (Road Circular No. R-09-10/06 dt.10.03.2010 )
25. Inspection Books and Registers. (Road Order No. F.45/P&M-II/circular/05/D-228 dt. 09.07.2010 )
26. Road safety (Road Order No. F-26/SE-Traffic/Traffic/09-10/D-250 dt.28.04.2010 )
27. Guidelines for repairs of KUM Roads (Road Circular of 2010 dt.16.09.2010 )
28. Inspection of works (Road Circular No. 2/2010 dt.02.12.2010 )
29. Patch repair (Road Circular No. R-1 of 2011 dt.11.10.2011 )
30. Quality of Bitumen (Road Circular No. R-01/2012 dt.12.01.2012 )
31. Transparency in const. works (Road Circular No. R-02/2012 dt.30.01.2012 )
32. Strengthening over existing bituminous roads (Road Circular of 2012 dt. 09.02.2012 )
33. Guidelines for renewal of Roads (Road Circular No. R-03/2012 dt.27.02.2012 )
34. Tack coat on existing bituminous surfaces. (Road Circular No. R-04/2012 dt.06.06.2012 )
35. Construction of long lasting Bituminous roads. (Road Circular No. R-05/2012 dt.06.06.2012 )
36. Comparison of material used in the tender documents (Road Circular of 2012 dt.12.07.2012 )
37. Traffic census (Road Circular No. R-06/2012 dt.13.07.2012 )
38. Environmental Management Fund. (Road Circular of 2012 dt.18.09.2012 )
39. Finalization of Tenders (Road Circular No. R-7/2012 dt. 30.11.2012 )
40. STP (Road Order No. 637 dt. 25.12.2012 )
41. Utilization of Road cut amount. (Road Circular No. 8/2012 dt. 26.12.2012 )
42. Revision of BSR (Road Circular of 2013 dt.05.06.2013 )
43. Deduction of Labor cess. (Road Circular of 2013 dt.24.06.2013 )
44. Construction of cement concrete pavements (Road Order No.CE/PWD/SE/(P&M)/D-1235 dt.11.09.2007 )
45. Road BSR April 2016 Rural Circle Jaipur dt. 01.04.2016
46. Antistripping Agent (Organosilane Bitumen Additive NanoTechnology ) dt. 01.02.2017

Administration

1. General Maintenance of Govt. Hospitals (General Circular No. 2/2000 )
2. Inspection of Build by Superintending Engineer (Civil) (General Circular No. 3/2000 )
3. Road cut by PHED/RSEB/Telephone Dept. (General Circular No. 4/2000 )
4. Encroachments by const. of Mandirs and Mazars on Highways (General Circular No. 5/2000 )
5. Deputation of Officers/Officials of the Dept. (General Circular No. 6/2000 )
6. Guidelines for keeping record of Bulk Bitumen (Contract Paver Work) (General Circular No. 7/2001 )
7. Maintenance of Service Book (General Circular No. 8/2002 )
8. 2 Tier System for PMGSY/CRF/Road Up gradation Project (General Circular No. 9/2002 )
9. Sanction of Annual Grade Increments to A.En. (General Circular No. 10/2002 )
10. Deputation of J.En. by ACE/SE (General Circular No. 11/2002 )
11. Headquarter Leaving Permission by Collector for Famine Relief Work (General Circular No. 12/2002 )
12. Inspection of Subordinate Officers ACE/SE/EE/A.En. (General Circular No. 14/2002 )
13. Ceiling Rates (Bldg.& Road maintenance) (General Order No.1115 dt.12.08.2002 )
14. Utilization of services of Junior Engineers posted in National Highway in Famine Relief Operations (General Circular No. 2/2003 )
15. Ceiling Rates for other Works expect Bluing works (General Order No.137 dt.23.02.2004 )
16. Disposal of surplus Properties of PWD (General Circular No. 4/2003 )
17. Tours/Visits of SE/EE in Jaipur (General Circular No. 1/2004 )
18. Annual Grade Increment & pay fixation (General Circular No. 1/2005 )
19. Approval of Tenders (General Order No.F.8(5)PW/2004/05 dt.13.01.2006 )
20. Execution of work under budget provisions (General Order No. Sec.1/A/2006/92 dt.10.03.2006 )
21. Standing council or appointment of Arbitrator (General Circular No. 1/2008 )
22. Reports and other general information (General Circular of dt.23.07.2008 )
23. Time schedule for completion of works (General Order No.EE/NH/D-990 dt.3.09.08 )
24. Inspection by ACE/SE/EE (General Circular No. 1/2009 )
25. Inspections/Tours & Night Halts of officers. (General P.14(1) PW/2012/Part-I dt.30.04.2012 Circular-I )
26. Inspections of Subordinates offices. (General P.14(1) PW/2012/Part-I dt.30.04.2012 Circular-II )
27. Work orders for construction of buildings (General Circular No. 1/2013 )
28. Permission leave Headquarter (General Circular No. 1/2014 )
29. Disposal cases in the PWD (General Standing Order dt.03.04.2014 )
30. Transfer of Gazetted/Non Gazetted (General Standing Order dt.06.08.2014 )
31. E-Tendering (General Order No.F.7(Circular)/Sec.II/10-11/D-38 dt.19.04.2012 )
32. Court Cases Procedure. (General Order No.F48(Gen)PW/AS/Sec-7/D-Spl-1 dt.14.05.2012 )
33. Budget for medical bills (General Order No.CE/Sec-11/P.3(90)/D-220 dt.27.06.2012 )
34. Court Cases (General Order No.F48(Gen)PW/AS/Sec-7/D-1849 dt.23.05.2014 )
35. Post Qualification of Contactors of road building and other works in the PWD (General Order No.F.8(27)PW/95 dt.14.09.2000 )
36. Potential Assessment method (General Order No. F8(27)PW/95 dt.18.04.2001 )
37. Potential Assessment method (Amended) (General Order dt.28.11.2001 )
38. Conversion of Agriculture land (General Order No.P.2/8/RAJ/Rev/Group-9/02 dt. 30.5.2002 )
39. The Payment of WBM work in PMGSY,CRF & NH Works (General Circulars No.1/2002 dt.22.01.2002 )
40. Extension in time of Completion, Excess items and Deviation statement (General Order No.F.8(9)PW/2000/672 dt.09.07.2002 )
41. Works within sanctioned budget (General Circulars of dt.08.08.2002 )
42. Completion certificate (General Order No.CE/PWD/EE/D&T/D-134 dt.11.07.03 )
43. Conversion of Forest land (General Order No.F( )PSF/FS/06/7032 dt.07.08.06 )
44. Conversion of Forest land (General Order No.PMGSY/2006/D-2057 dt. 17.08.2006 )
45. Potential bids approval (General Circulars NO.F.8(27)PW/95 dt.07.06.2007 )
46. Allotment of works for unemployed Degree/Diploma holders. (General Order No.F.8(13)PW/2007/D-437 dt.16.06.2007 )
47. RTI Acts 2005 (General Order dt.10.07.2008 )
48. Maintenance of Roads (General Circulars of dt.8.06.2009 )
49. RTI Acts 2005 (General Order No.SE/PW/RT/08/D-402 dt.21.10.2009 )
50. Preparation of BSR (General Order No.CE(NH)/SE(NH)/D-1203 dt.10.11.2009 )
51. Rates Analysis (General Order No.F.28/Misc/Sec-3/D-1999 dt.08.12.2009 )
52. Tender for toll on BOT project (General Order No.PS/PS-PWD/2010/D-28 dt.27.01.2010 )
53. Memo received from AG (General Order No.P.10( )09-10/CE//Sec-13/172 dt.17.02.2010 )
54. APAs of officers (General Order No.1(17)PW/2007 dt.11.04.2011 )
55. The time schedule for completion of work (General Order No.SE/NH/08/EE-1/D-990 dt.03.09.2008 )
56. Amendment in Circular of dt.27.04.2009 (General Order No.SE/(PMGSY)Circulars/2009/D-4400 dt.05.05.2009 )
57. Policy for Selection of pipes for water supply. (General Circular of dt.25.05.2010 )
58. Guidelines for execution of various urgent nature work (General Circular of dt.27.10.2010 )
59. Patch repair work with WBM/WMM (General Circular (R-1) of dt.11.10.11 )
60. Quality of Bitumen (General Circular R-1/2012 dt.11.01.2012 )
61. CRC of bulk Bitumen (General Circular No.01/2012 DT.05.03.2012 )
62. Tack coat on existing Bituminous surfaces (General Circular R-4/2012 dt.06.06.2012 )
63. Damaging road surfaces (General Circular-12 dt.14.06.2012 )
64. Constriction of road/bldg. in catchment area (General Circular of dt.09.07.2012 )
65. Traffic census (General Circular R-6/2012-13 dt.13.07.2012 )
66. Damages of road berms (General Order No.533 dt.13.07.2012 )
67. Execution of Construction work (General Circular dt.13.07.2012 )
68. Guide lines to prepare for seeking approval under Forest- Conservation Act (FCA) 1980 (General Order No. ACE/BOT/Gen/12-13/D-2833 dt.13.09.2012 )
69. Finalization of tenders (General Circular No.R-7/2012-13 dt.30.11.2012 )
70. Meeting of tender approval committee (General Order No.PA/CE & AS/2013/D-1635 dt.19.02.2013 )
71. Monitor submission of tender (General Order No.PA/CE&AS/2013/D-1636 dt.19.02.2013 )
72. State Quality Monitor (General Circular No.1/2013 dt.19.02.2013 )
73. Maintenance of rest house (General Order No.P-1(16)/Gen Adm/5/2009 dt.11.02.2013 )
74. Intra-dept. meeting (General Circular dt.08.03.2013 )
75. Inauguration of new roads (General Circular dt.11.03.2003 )
76. Forecast estimate (General Circular of dt.04.06.2013 )
77. Completion of work within time (General Order No. CE/Sec-3/D-410 dt.1.07.2013 )
78. Handing over the completed Government bldg. (General Circular 1/2013-14 dt.24.07.2013 )
79. Forecast estimate (General Circular No.2/2013-14 )
80. Damages of roads (General Order No.P-14(44)PW/2013 dt..07.08.2013 )
81. Use of RBI grade 81 compound for soil stabilization (General Order No.SE(R)P&M-IV/2013/D-936 dt.23.08.2013 )
82. Timely removal of the barricading material (General Circular -3 dt.28.01.2014 )
83. Submission of tenders (General Order No. CE(SS)/PA/D-946 dt.24.02.2014 )
84. NIB (General Circular dt.30.01.2014 )
85. Tender exceeds from admn & financial sanction (General Circular No.1/2014-15 dt.07.05.2014 )
86. Meeting of standing committees for settlement of disputes (General Circular No.01 dt.09.05.2014 )
87. Highways (General Rajasthan Highways Act,1995 )
88. Road Development (General Rajasthan Road Development Act,2002 )
89. Road Development (General Rajasthan Road Development Act dt.03.09.2005 )
90. Fee Rules (General Rajasthan Road Development Act dt.30.03.2009 )
91. PPP Project with VGF (General Rajasthan Road Development Act dt.22.09.2009 )
92. Fee Rules (General Rajasthan Road Development Act dt.30.03.2011 )
93. Fee Rules (General Rajasthan Road Development Act dt.05.07.2011 )
94. Road Development (General Rajasthan Road Development Act,2004 )
95. Road Development Act (General Rajasthan Road Development Act dt.06.09.2004 )
96. Road Development Act (General Rajasthan Road Development Act dt.06.09.2004 )
97. Road Development Act (General Rajasthan Road Development Act dt. 06.09.2004 )
98. Rates of Cess (General Rajasthan Road Development Act dt. 06.09.2004 )
99. Road Development Act (General Rajasthan Road Development Act dt. 04.04.2005 )
100. Road Development Act (General Rajasthan Road Development Act dt. 07.04.2005 )
101. Amendments in Rates of Cess (General Rajasthan Road Development Act dt. 03.02.2015 )

Pradhan Mantri Gram Sadak Yojna (PMGSY)

1. Guidelines for keeping record of Bulk Bitumen (Contract Paver Works). (PMGSY 7/2001F.78(1)/Sec.I/A/2k/D-4536 dt. 17-07-01 )
2. Logo of PMGSY. (PMGSY P-17017/4/99-RC dt.28-12-01 )
3. Quality Control on PMGSY works. (PMGSY F.7()/Sec.II/PMGSY Cir/D-510 dt. 22-01-02 )
4. Payment of WBM work in PMGSY. (PMGSY 01/2002 (EE(D&T)/D-661) dt. 22-01-02 )
5. Regarding work order amount. (PMGSY EE(R&D-II)/PMGSY/General/2001/D-862 dt. 11-02-02 )
6. Use of bitumen. (PMGSY 3/2002 (F.11/Meeting/QC/EE/D&T/D-710 dt.22-02-02 )
7. Quality Control on PMGSY works. (PMGSY F.7(595)Sec.II/PMGSY Cir/D-425 dt. 19-03-02 )
8. Inspection of roads. (PMGSY CE/PWD/EE(M)/86 dt. 09-04-02 )
9. Preparation of technical estimates. (PMGSY F.8(9)PW/2000/Pt.II/405 dt. 02-05-02 )
10. Use of material for construction of sub base. (PMGSY 14/2002CE/PWD/EE(M)/218 dt. 08-05-02 )
11. PMGSY work during the monsoon period. (PMGSY (R&D-II)/PMGSY/General/2001/D-1102 dt. 23-05-02 )
12. To check the weight of the mix-material in transit. (PMGSY 16/2002CE/PWD/EE(M)/336 dt. 22-07-02 )
13. Regarding weigh-bridges installed at plant. (PMGSY 17/2002CE/PWD/EE(M)/337 dt. 22-07-02 )
14. Scrutiny of PMGSY estimated by STA. (PMGSY EE(R&D-II)/STA/D-1502 dt. 20-10-02 )
15. Use of mixture machine for mixing of cement concrete. (PMGSY 3/2003CE/PWD/SE(P&D)/EE(M&QC)/-734 dt. 19-02-03 )
16. Construction of road under PMGSY. (PMGSY EE(R&D-II)/PMGSY/03 dt. 07-04-03 )
17. The Grading system. (PMGSY 5/2003CE/PWD/SE(P&D)/EE(M&QC)/D-01 dt. 03-05-03 )
18. Preparation of detailed project report-DPR (PMGSY EE(R&D-II)/PMGSY/D-1791 dt. 16-05-03 )
19. Preparation of estimates for PMGSY works. (PMGSY EE(R&D)/PMGSY/STA/08/D-1925 dt. 30-06-03 )
20. CBR tests. (PMGSY 13/2003-2004 dt. 17-10-03 )
21. Construction of road under PMGSY. (PMGSY EE(R&D)/PMGSY/Circular/2003/D-2106 dt.14-11-03 )
22. Execution of PMGSYworks. (PMGSY EE(R&D)/PMGSY/Circular/2003 dt. 02-01-04 )
23. Use of CRMB. (PMGSY CE(NH)/TA/D-2986 dt. 02-01-04 )
24. Estimates for the regular allocation. (PMGSY EE(R&D-II)STA/04/D-2160 dt. 05-02-04 )
25. Workshop regarding quality control of works. (PMGSY EE(P&M)/D-191 dt. 08-03-04 )
26. Use of CRMB.for wearing course on roads under PMGSY. (PMGSY 1/2004SE(P&M)/D-198 dt. 11-03-04 )
27. Providing specified camber on carriageways. (PMGSY 3/2004 SE(P&M)/D-218 dt. 27-03-04 )
28. Construciton of road through DRDA. (PMGSY P.45/P&M-II/Circular/04/D-2449 dt. 31-03-04 )
29. Construction of road under PMGSY. (PMGSY P.10( )/2/2004 dt. 01-06-04 )
30. Consultation with Panchayat Institutions. (PMGSY P-14018/1/2004-NRRDA dt. 06-07-04 )
31. PMGSY-Preparation of proposals for un-connected PHQs. (PMGSY F.14(3)/PW/PMGSY/Policy/2004/D-69 dt. 06-08-04 )
32. Quality Control test according to norms. (PMGSY CE/PWD/QC/D-251 dt. 02-09-04 )
33. Integrated Development of Rural road Network under PMGSY. (PMGSY SE(PMGSY)IDRRN/2004/D-1559 dt. 16-09-04 )
34. Development and operationalisation of computerized database for rural roads in GIS. (PMGSY EE(OMMS)/PMGSY/2004/D-109 dt. 04-10-04 )
35. Regarding proposals of forest clearance. (PMGSY SE(PMGSY)/Circular/04/D-1597 dt. 07-10-04 )
36. Availability of revenue track for PMGSY roads. (PMGSY F.3(2)/Raj-6/2003 dt. 08-11-04 )
37. Regulation of expenditure in excess of estimates approved by MoRD. (PMGSY A-12015/07/2003-NRRDA dt. 30-11-04 )
38. Inspection of NQMs. (PMGSY SE(PMGSY)/NQM/2005/D-496 dt. 27-01-05 )
39. Estimation of cost of routine maintenance activities during thecontract period 5 years for PMGSY works. (PMGSY SE(PMGSY)/OMMAS/2004/D-142 dt. 01-01-05 )
40. Regarding term & conditions of contract. (PMGSY F.2(535)/Sec.14/04-05/D-375 dt. 02-04-05 )
41. Regarding Standard Data Book. (PMGSY SE(PMGSY)Circular/2005/D-2224 dt. 23-04-05 )
42. CBR Value. (PMGSY 2/2005 SE(PMGSY)Circular/2005/D-2234 dt. 25-04-05 )
43. Detailed procedural guidelines for clearance of world Bank aided rural roads projects. (PMGSY P-17029/5/04-Pt.I dt. 25-04-05 )
44. Proper cleaning of WBM surface. (PMGSY 1/2005 SE(PMGSY)Circular/D-2377 dt. 14-06-05 )
45. Regarding checking of line, grade, cross fall & compaction of shoulders. (PMGSY 2/2005SE(PMGSY)Circular/D-2378 dt. 14-06-05 )
46. Norms of Engineers for inspection of roads. (PMGSY 38412 SE(PMGSY)Circular/D-2379 dt. 14-06-05 )
47. Environmental & social assessment mission of World Bank. (PMGSY SE(PMGSY)/WB/D-2431 dt. 02-07-05 )
48. PMGSY proposals. (PMGSY EE(R&D)/D-213 dt. 30-07-05 )
49. Specification for concrete pavements for PMGSY roads. (PMGSY 4/2005 SE(PMGSY)Circular/D-214 dt. 01-08-05 )
50. Instruction regarding construction of road under PMGSY. (PMGSY SE(PMGSY)/Circular/05/D-225 dt. 21-08-05 )
51. Specification for concrete pavements for PMGSY roads. (PMGSY SE(PMGSY)/Circular/05/D-224 dt. 21-03-05 )
52. Role of technical examiners. (PMGSY SE(PMGSY)/WB/Circular/05/D-2640 dt. 30-08-05 )
53. Adoption of Mechanical means for spreading of materials. (PMGSY 5/2005 SE(PMGSY)/WB/Circular/2005/D-2704 dt. 01-09-05 )
54. Technical sanction of estimate of PMGSY works. (PMGSY 6/2005 SE(PMGSY)/WB/Circular/2005/D-236 dt. 05-09-05 )
55. Bid documents for PMGSY works. (PMGSY SE(PMGSY)/WB/05/D-2725 dt. 26-09-05 )
56. Attention to quality of bituminous construction under PMGSY. (PMGSY P-14018/1/2005/PIII&QM dt. 03-10-05 )
57. Attention to quality of bituminous construction under PMGSY. (PMGSY EE(PMGSY)/NQM/2005/D-1182 dt. 15-10-05 )
58. Required NOC for Pollution Control for Hot Mix Plant. (PMGSY EE(WB)/2005/D-2848 dt. 26-10-05 )
59. Crossing of the right of the users (ROW) for construction under PMGSY. (PMGSY EE(PMGSY)NQM/2005/D-2925 dt. 22-11-05 )
60. Checking of surface of PMGSY roads. (PMGSY CE/PWD/ACE(HQ)/D-444 dt. 20-12-05 )
61. Project formulation and quality monitoring. (PMGSY SE(PMGSY)/2005/D-3054 dt. 27-12-05 )
62. Transparency in execution of road works under PMGSY. (PMGSY P-17025/4/2005/P-III dt. 21-12-05 )
63. Technical sanction of estimate of PMGSY works. (PMGSY 6/2005 SE(PMGSY)/Circular/2005/D-236 dt. 05-09-05 )
64. PMGSY Dos & Dont in quality. (PMGSY 1/2006SE(PMGSY)/Circular/2006/D-3175 dt. 25-02-06 )
65. Contractual Maintenance of PMGSY roads. (PMGSY 5/2006SE(PMGSY)/Circular/2006/D-115 dt. 04-05-06 )
66. Visit of PMGSY roads by the engineers. (PMGSY 6/2007SE(PMGSY)/Circular/2007/D-738 dt. 06-01-07 )
67. Maintenance of roads constructed under PMGSY. (PMGSY SE(PMGSY)/07/D-827 dt. 14-02-07 )
68. Check list for running & final bills. (PMGSY 7/2007D-864 dt. 28-02-07 )
69. Certificate for thickness of sub-base and base course. (PMGSY 8/2007 D-865 dt. 28-02-07 )
70. Maintenance of roads constructed under PMGSY. (PMGSY SE(PMGSY)07/D-898 dt. 14-03-07 )
71. First tier of quality management and payment of first running bill. (PMGSY SE(PMGSY)/Mics/D-917 dt. 24-03-07 )
72. Norms of Engineers for inspection of roads. (PMGSY Sec.I/A/07/D-90 dt. 05-04-07 )
73. Maintenance of roads constructed by PWD. (PMGSY CE/PMGSY/2007/D-1071 dt. 30-05-07 )
74. Maintenance of roads constructed under PMGSY. (PMGSY SE(PMGSY)/07/D-2251 dt. 10-09-07 )
75. Maintenance of roads constructed by PWD. (PMGSY F.10(P&M-II)/VR/07/561 dt. 20-12-07 )
76. Maintenance of roads constructed by PWD. (PMGSY F.10(P&M-II)/VR/07/683 dt. 05-03-08 )
77. Maintenance of roads constructed by PWD. (PMGSY D-4013 dt. 28-10-09 )
78. Foundation laying / inauguration of projects under PMGSY. (PMGSY P-17025/11/10-RC dt. 11-03-10 )
79. Memorandum - PMGSY regarding. (PMGSY P-17025/6/10-RC dt. 16-03-10 )
80. Joint inspection and Foundation laying / inauguration of projects under PMGSY. (PMGSY P-17025/11/10-RC dt. 4/2010 )
81. Inspection norms of roads under PMGSY. (PMGSY Assembly Cell/2010/D-819 dt. 18-05-10 )
82. Uploading of quality grading of items / sub-items and photographs of works inspected under 2nd Tier of quality monitoring. (PMGSY P-17012/1/2009/P-III dt. 22-10-10 )
83. Advisory on the submission of project proposals with long span bridges. (PMGSY P-14012/45/2004-Tech. dt. 09-02-11 )
84. Left out bridges on roads already sanctioned under PMGSY. (PMGSY 4/2011 P-17017/1/2010-RC dt. 28-04-11 )
85. Uploading of quality grading of items / sub-items and photographs of works inspected under 2nd Tier of quality monitoring. (PMGSY 6/2011 P-17017/1/2010-RC dt. 28-04-11 )
86. Substituting of tyres of Iron-tyred Bullock Carts with Pneumatic Tyres. (PMGSY P-17017/1/2010-RC dt. 27-05-11 )
87. Meeting of Gram Sabha after Transect Walk for preparation of Detailed Project Reports under PMGSY. (PMGSY 9/2011 P-17017/1/2010-RC dt. 27-07-11 )
88. Participation of honble Members of Parliament in selection of eligible propalsa, joint inspection and foundation laying ceremoney under PMGSY. (PMGSY 10/2011 P-17017/1/2010-RC dt. 27-07-11 )
89. Uploading the quality grading of items / sub-items and photographs of works inspected under 2nd tier of quality monitoring. (PMGSY P-17026/1/2006/P-III dt. 04-08-11 )
90. Use of Saving of PMGSY works. (PMGSY SE(PMGSY)/2011/D-775 dt. 11-10-11 )
91. Regarding issue of authorization. (PMGSY SE(PMGSY)/Accounts/2011/D-793 dt. 12-10-11 )
92. Use of Saving of PMGSY works. (PMGSY SE(PMGSY)/2011/D-794 dt. 12-10-11 )
93. Detailed Project Reports for PMGSY sanctions - Submission in PDF format in DVDs regarding. (PMGSY P-17017/1/2010-RC dt. 09-01-12 )
94. Provision of plantation work in the DPRs of PMGSY proposals. (PMGSY SE(PMGSY)/2011/D-2488 dt. 31-01-12 )
95. Construction of road under PMGSY (PMGSY Order No.F.7(721)Sec.11/03/D-742 dt.22.07.2004 )
96.

Quality Control on PMGSY works. (PMGSY Order No. SE(PMGSY) Circulars/2008/D-2867 dt.18.03.2008 )

 

: :