Sr.No. |
Dated |
Discricption |
Remarks |
1 |
08-12-1954 |
The Rajasthan Service of Engineering (B&R Branch) Rules, 1954 |
|
2 |
03-09-1973 |
The Rajasthan Subordinate Engineering (B&R Branch) Service Rules, 1973 |
|
3 |
28-04-2002 |
Road Development (General Rajasthan Road Development Act,2002 ) |
|
4 |
10-08-2004 |
Road Development (General Rajasthan Road Development Act,2004 ) |
|
5 |
06-09-2004 |
Rajasthan State Road Fund (SRF) Rules, 2004 and Further Amendments |
|
6 |
06-09-2004 |
Road Development Act (General Rajasthan Road Development Act dt.06.09.2004 ) |
|
7 |
06-09-2004 |
Road Development Act (General Rajasthan Road Development Act dt.06.09.2004 ) |
|
8 |
06-09-2004 |
Road Development Act (General Rajasthan Road Development Act dt. 06.09.2004 ) |
|
9 |
06-09-2004 |
Rates of Cess (General Rajasthan Road Development Act dt. 06.09.2004 ) |
|
10 |
04-04-2005 |
Road Development Act (General Rajasthan Road Development Act dt. 04.04.2005 ) |
|
11 |
07-04-2005 |
Road Development Act (General Rajasthan Road Development Act dt. 07.04.2005 ) |
|
12 |
03-09-2005 |
Road Development (General Rajasthan Road Development Act dt.03.09.2005 ) |
|
13 |
30-03-2009 |
Fee Rules (General Rajasthan Road Development Act dt.30.03.2009 ) |
|
14 |
22-09-2009 |
PPP Project with VGF (General Rajasthan Road Development Act dt.22.09.2009 ) |
|
15 |
30-03-2011 |
Fee Rules (General Rajasthan Road Development Act dt.30.03.2011 ) |
|
16 |
05-07-2011 |
Fee Rules (General Rajasthan Road Development Act dt.05.07.2011 ) |
|
17 |
23-04-2013 |
The Sexual Harassment of women at workplace Act 2013 |
|
18 |
03-02-2015 |
Amendments in Rates of Cess (General Rajasthan Road Development Act dt. 03.02.2015 ) |
|
19 |
08-05-2015 |
Rajasthan State Highways Act 2014 |
|
20 |
29-05-2015 |
Rajasthan State Highways Fee (Determination of Rates and Collection) Rules, 2015 (Dated 29/05/2015) |
|
IMPORTANT CIRCULARS/ NOTIFICATIONS/GUIDELINES
Building
|
Sr.No. |
Dated |
Discricption |
Remarks |
1 |
|
Reasonable area of the built up space for officers, staff (Building Standing Order No.144 ) |
|
2 |
|
General Instructions to be followed while preparing detailed estimates. (Building Circular No. 19(Bldg. 6) ) |
|
3 |
|
Check-list for taking over newly construction bldg. from contractors. (Building Circular No. 36(Bldg. 6) ) |
|
4 |
|
Bldg Valuation (Building Standing Order No. X-3/2011 ) |
|
5 |
23-11-2012 |
Forecast Estimate (Building Order No.P.14(18)PW/2012 ) |
|
6 |
12-08-2002 |
Tender ceiling rates (Building Order No.SE(Road)/EE/ceiling rates /D-1115 dt.12.08.2002 ) |
|
7 |
04-06-2005 |
Rain harvesting in Govt. Bldgs. (Building Circular dt.04.06.2005 ) |
|
8 |
13-01-2006 |
Tender Processing (Building Order No.F8(6)PW/2004/5 dt.13.01.2006 ) |
|
9 |
29-05-2006 |
Safety in Excavation work in Bldg. (Building Circular No. 1/2006 dt.29.05.2006 ) |
|
10 |
20-01-2007 |
Circular for fair rent rates clarification (Building Circular of 2007 dt. 20.01.2007 ) |
|
11 |
23-09-2008 |
Use of energy efficient lamps (Building Circular dt. 23.09.2008 ) |
|
12 |
23-09-2008 |
Circular for Electrical Provision in Estimates (Building Circular of 2008 dt. 23.09.2008 ) |
|
13 |
13-07-2009 |
Economy in Bldg. Construction. (Building Circular dt.13.07.2009 ) |
|
14 |
07-10-2009 |
DLP (Building Order No.CE(Bldg.)DLP(Bldg. Works)/D-268 dt. 07.10.2009 ) |
|
15 |
03-05-2010 |
Directions regarding improvement in Bldg Construction (Building Order No.PS/PS-PWD/10/D-728 dt. 03.05.2010 ) |
|
16 |
10-05-2011 |
Additional Security (Building Order No.PS/PS-PWD/2011 dt.10.05.2011 ) |
|
17 |
17-08-2011 |
Fixing of Rain water pipe (Building Circulars dt.17.08.11 ) |
|
18 |
30-01-2012 |
Selection of land/site for bldg. construction works (Building Circular dt. 30.01.2012 ) |
|
19 |
30-01-2012 |
Falling of loose ceiling Plaster (Building Circulars dt.30.1.2012 ) |
|
20 |
17-07-2012 |
Tenders of Bldg. works (Building Circular dt.17.07.2012 ) |
|
21 |
20-07-2012 |
Construction of Bldg. and culvert work (Building Circular dt. 20.07.2012 ) |
|
22 |
08-08-2012 |
Rates of PWD Dak Banglows,Rest house, Inspections Banglows. (Building Order no.P.14(13)PW/2005 dt.08.08.2012 ) |
|
23 |
10-09-2012 |
DLP (Building Order No. CE(Bldg.)/DLP(Bldg. works/D-837 dt. 10.09.2012 ) |
|
24 |
11-09-2012 |
DLP (Building Order No.SE(SS)/DLP/2011-12/D-1045 dt.11.09.2012 ) |
|
25 |
12-10-2012 |
DLP (Building Order No.CE(Bldg)/DLP(Bldg works)/D-980 dt.12.10.2012 ) |
|
26 |
21-01-2013 |
Use of Steel in bldg. works (Building Circular dt. 21.01.2013 ) |
|
27 |
20-03-2013 |
Completion of Bldg. within Sanction amount (Building Circular No.1/2013 dt.20.03.2013 ) |
|
28 |
04-06-2013 |
Adoption of green bldg. measures. (Building Circular of 2013 dt.04.06.2013 ) |
|
29 |
04-06-2013 |
Provisional of air cooling/condition etc. in forecast estimates. (Building Circular of 2013 dt.04.06.2013 ) |
|
30 |
24-06-2013 |
Deduction of Labour Cess Circular-556 Dated 24-06-2013 |
|
31 |
05-09-2013 |
Demolition of unsafe Bldgs. (Building Order No.F.14(47)PW/2013 dt.05.09.2013 ) |
|
32 |
03-01-2014 |
Repair and maintenance of Govt. Quarters (Building Circular dt. 03.01.2014 ) |
|
33 |
06-01-2014 |
RTPP Rules 2013 (Building Order No. ACE(M)PWD/SPPP/13-14/D-915 dt. 06.01.2014 ) |
|
34 |
28-01-2014 |
Safety during Barricading (Building Circular No.3 dt.28.01.2014 ) |
|
35 |
17-05-2016 |
Revised Rate of Dak Banglow stay and rules dt 17.05.2016 |
|
36 |
15-06-2016 |
Price Variation Clause Dt 15-6-2016 |
|
37 |
28-06-2016 |
Department of Social and Empowerment Department, handicapped accessible empowerment Department guidelines regarding government building (Building Circulars dt.28.06.2016) |
|
38 |
08-08-2016 |
Use of Steel TMT Re-Bar Circular dated 8.8.2016 Cell (D&T) |
|
39 |
24-08-2016 |
Rain Water Harvesting in Bldg. Circular dated 24.8.2016 Cell (D&T) |
|
40 |
20-09-2016 |
Additional performance security on un-balanced bids |
|
41 |
05-10-2016 |
Building BSR-2016 City Circle Jaipur dt 05.10.2016 |
|
42 |
19-01-2017 |
Circular LOC Issuing Regarding Digital India No.199 Dated 19-01-2017 |
|
43 |
27-09-2017 |
Circular Regarding Additional Performance Security No.123 Dated 27-09-2017 |
|
44 |
24-10-2017 |
Circular Regarding Encrochment of pwd road boundary no.130 Dated 24-10-2017 |
|
45 |
09-11-2017 |
Circular Regarding Building Safety Certificate No.139 Dated 09-11-2017 |
|
46 |
09-11-2017 |
Circular Regarding Building Safety Certificate No.139 Dated 09-11-2017 |
|
47 |
04-02-2019 |
Circular Regarding Fixing of Ceiling rates for tender premium Dated 04.02.2019 |
|
48 |
22-12-2022 |
Circular regarding approval of Non-BSR Item in same financial year |
|
Roads
|
Sr.No. |
Dated |
Discricption |
Remarks |
1 |
22-07-2002 |
Mix- Material of bitumen (Road Circular No. 16/2002 dt.22.07.2002 ) |
|
2 |
02-04-2005 |
Use of Mineral Waste/Over burden in construction of Bldgs. (Road Circular No. 1/2005-06 dt.02.04.2005 ) |
|
3 |
26-04-2005 |
Const. of CC roads. (Road Circular No. 2/2005-06 dt.26.04.2005 ) |
|
4 |
25-11-2005 |
Use of tack coat (Road Circular of 2005 dt. 25.11.2005 ) |
|
5 |
11-12-2006 |
Use of Portland Pozzolana Cement (Road Circular No. 3/2006 dt.11.12.2006 ) |
|
6 |
05-05-2007 |
Patch and shoulders repair. (Road Circular No. 1/2007-08 dt.05.05.2007 ) |
|
7 |
05-05-2007 |
Target achievement. (Road Circular No. 2/2007-08 dt.05.05.2007 ) |
|
8 |
05-05-2007 |
Construction of shoulders. (Road Circular No. 3/2007-08 dt.05.05.2007 ) |
|
9 |
05-05-2007 |
Land Acquisition (Road Circular No. 4/2007-08 dt.05.05.2007 ) |
|
10 |
27-07-2007 |
Excess / Extra items (Road Circular No. 9/2007 dt. 27.07.2007 ) |
|
11 |
02-08-2007 |
Utilization certificate from RSRDCC (Road Circular No. 1/2007-08 dt.02.08.2007 ) |
|
12 |
02-08-2007 |
Providing drainage (Road Circular No. 3/2007-08 dt.02.08.2007 ) |
|
13 |
18-08-2007 |
S&I for CD works. (Road Circular No. 4/2007-08 dt.18.08.2007 ) |
|
14 |
01-09-2007 |
Disposal of Rain water and repair of berms. (Road Circular No. 5/2007-08 dt.01.09.2007 ) |
|
15 |
11-09-2007 |
Construction of cement concrete pavements (Road Order No.CE/PWD/SE/(P&M)/D-1235 dt.11.09.2007 ) |
|
16 |
29-03-2008 |
Norms of QC (Road Circular No. 1/2008 dt.29.03.2008 ) |
|
17 |
06-05-2008 |
Plantation on roads (Road Circular No. 7/2008-09 dt.06.05.2008 ) |
|
18 |
12-02-2009 |
Road safety (Road Circular No. 10/2008-09 dt.12.02.2009 ) |
|
19 |
17-07-2009 |
Encroachment in road boundary (Road Circular No. R-09/01dt.17.07.2009 ) |
|
20 |
17-09-2009 |
Improvement of riding quality. (Road Circular No. 6/2007-08 dt.17.09.2009 ) |
|
21 |
29-09-2009 |
Const. of CC Roads (Road Circular No. R-09/01 of 29.09.2009 ) |
|
22 |
01-10-2009 |
Right of way and bldg.lines (Road Circular No. R-09/03 dt.01.10.2009 ) |
|
23 |
11-12-2009 |
Const. of berms (Road Circular No. R-09/05 dt.11.12.2009 ) |
|
24 |
22-12-2009 |
Position of various utilities on the road sides. (Road Circular No. R-4/2009 dt.22.12.2009 ) |
|
25 |
10-03-2010 |
Construction Junction of roads in NAREGA Schemes (Road Circular No. R-09-10/06 dt.10.03.2010 ) |
|
26 |
28-04-2010 |
Road safety (Road Order No. F-26/SE-Traffic/Traffic/09-10/D-250 dt.28.04.2010 ) |
|
27 |
09-07-2010 |
Inspection Books and Registers. (Road Order No. F.45/P&M-II/circular/05/D-228 dt. 09.07.2010 ) |
|
28 |
16-09-2010 |
Guidelines for repairs of KUM Roads (Road Circular of 2010 dt.16.09.2010 ) |
|
29 |
02-12-2010 |
Inspection of works (Road Circular No. 2/2010 dt.02.12.2010 ) |
|
30 |
11-10-2011 |
Patch repair (Road Circular No. R-1 of 2011 dt.11.10.2011 ) |
|
31 |
12-01-2012 |
CIRCULAR NO. R-1-2012 Dated 12-1-12 |
|
32 |
12-01-2012 |
Quality of Bitumen (Road Circular No. R-01/2012 dt.12.01.2012 ) |
|
33 |
30-01-2012 |
Transparency in const. works (Road Circular No. R-02/2012 dt.30.01.2012 ) |
|
34 |
09-02-2012 |
Strengthening over existing bituminous roads (Road Circular of 2012 dt. 09.02.2012 ) |
|
35 |
27-02-2012 |
Guidelines for renewal of Roads (Road Circular No. R-03/2012 dt.27.02.2012 ) |
|
36 |
06-06-2012 |
CIRCULAR NO. R-5-2012 Dated 06-6-12 |
|
37 |
06-06-2012 |
CIRCULAR NO. R-4-2012 Dated 06-6-12 |
|
38 |
06-06-2012 |
Tack coat on existing bituminous surfaces. (Road Circular No. R-04/2012 dt.06.06.2012 ) |
|
39 |
06-06-2012 |
Construction of long lasting Bituminous roads. (Road Circular No. R-05/2012 dt.06.06.2012 ) |
|
40 |
12-07-2012 |
Comparison of material used in the tender documents (Road Circular of 2012 dt.12.07.2012 ) |
|
41 |
13-07-2012 |
Traffic census (Road Circular No. R-06/2012 dt.13.07.2012 ) |
|
42 |
18-09-2012 |
Environmental Management Fund. (Road Circular of 2012 dt.18.09.2012 ) |
|
43 |
30-11-2012 |
Finalization of Tenders (Road Circular No. R-7/2012 dt. 30.11.2012 ) |
|
44 |
25-12-2012 |
STP (Road Order No. 637 dt. 25.12.2012 ) |
|
45 |
26-12-2012 |
Utilization of Road cut amount. (Road Circular No. 8/2012 dt. 26.12.2012 ) |
|
46 |
05-06-2013 |
Revision of BSR (Road Circular of 2013 dt.05.06.2013 ) |
|
47 |
24-06-2013 |
Deduction of Labor cess. (Road Circular of 2013 dt.24.06.2013 ) |
|
48 |
12-05-2015 |
Crust Disign Roads Circular No.2/2015-16 dated 12.5.2015 Cell (D&T) |
|
49 |
12-05-2015 |
Direction for preparing Crust Thickness proposals for Road Construction/Upgradation/Renewal after considering overloading capacity of passing vehicles(D-958 12-05-2015) |
|
50 |
01-04-2016 |
Road BSR April 2016 Rural Circle Jaipur dt. 01.04.2016 |
|
51 |
13-06-2016 |
Conditions for Proper Monitoring of Constriction Work Circular dated 13.6.2016 Cell (SE-Road) |
|
52 |
01-02-2017 |
Circular Regarding Antistripping Agents No.205 Dated 01-02-2017 |
|
53 |
01-02-2017 |
Antistripping Agent (Organosilane Bitumen Additive NanoTechnology ) dt. 01.02.2017 |
|
54 |
27-09-2017 |
Circular Additional performance security on un-balance bids dated 27-9-2017 |
|
55 |
27-10-2017 |
Circular Regarding Joint Inspections No.135 Dated 27-10-2017 |
|
56 |
19-02-2018 |
Circular Regarding road Signages No.176 Dated 19-02-2018 |
|
57 |
19-02-2018 |
Circular reagding Promote road saftey and efficiency dated 19.02.2018 |
|
58 |
30-04-2018 |
Circular Guidelines Regarding GGP Works No.84 Dated 30-04-2018 |
|
59 |
13-07-2018 |
Circular Implementation of Road Safety parameters No.118 Dated 13-07-2018 |
|
60 |
07-09-2018 |
Circular Updation of Defect Liability Period (DLP) No.216 Dated 07-09-2018 |
|
61 |
07-09-2018 |
Circular Regarding Maintenance of road under DLP No.217 Dated 07-09-2018 |
|
62 |
17-09-2018 |
Circular Regarding Defect Liability Period No.644 Dated 17-09-2018 |
|
63 |
22-11-2018 |
Definition of Non-patchable Road D-1545 Dated 22-11-2018 |
|
64 |
04-02-2019 |
Circular Regarding Potential Assessment/Post Qualifications dated 04.02.2019 |
|
65 |
14-10-2021 |
Circular of Office Regarding use of Steel for PWD Works |
|
66 |
22-11-2021 |
UAT-I Workshop on RAMS |
|
67 |
22-11-2021 |
Maintenance Planning and Budgeting Training-RAMS |
|
National Highways
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
20-06-2003 |
Speed breakers on NH (NH Circular of Dt. 20.06.2003 ) |
|
2 |
02-01-2004 |
Use of CRMB (NH Circular of Dt. 02.01.2004 ) |
|
3 |
08-06-2007 |
Rain damages in NH (NH Circular of Dt. 08.06.2007 ) |
|
4 |
08-06-2007 |
Km. Stone/200Mtr. Stone (NH Circular of Dt. 08.06.2007 ) |
|
5 |
01-01-2008 |
CRF Road work (NH Circular of Dt. 01.01.2008 ) |
|
6 |
12-06-2008 |
Permission for road cutting to Govt. department/undertaking (NH Order No.CE(NH)/Sr.PA/D-229 dt.12.06.2008 ) |
|
7 |
05-10-2009 |
Road side plantation under CRF works. (NH Circular of Dt. 05.10.2009 ) |
|
8 |
16-09-2010 |
Modification by Empowered Board (NH Order No. F-5(15)(177)Sec.-II/2009/D-45 Dt. 16.09.2010 ) |
|
9 |
22-02-2011 |
Tendering Process and timely execution of works (NH Order No.SE(NH)/PA/EI/D-22.02.2011 ) |
|
10 |
06-12-2012 |
DLP (NH Order No.SE(NH)/DLP-41/2012-13/D-1626 Dt. 06.12.2012 ) |
|
11 |
04-05-2013 |
Prevention of Unauthorized advertisement Board/Hoardings on the roads (NH Circular of Dt. 04.05.2013 ) |
|
12 |
23-11-2015 |
Streamlining of Technical Sanction of estimates and tendering Process of CRF Works (D-1612-23-11-2015) |
|
13 |
28-03-2016 |
Execution of CRF Works within the work order amount (NH-d-442- 28-03-2016) |
|
14 |
30-03-2016 |
Submission of additional Performance Security for unbalanced bid of CRF works (NH- D-445 dated 30-03-2016) |
|
15 |
01-04-2016 |
Additional Performance Security against Unbalanced Bids (NH- D-446 dated 01-04-2016) |
|
16 |
04-08-2016 |
Regarding Ongoing CRF Works (NH- D-926-04-08-2016) |
|
17 |
22-08-2016 |
Guidelines for procurements, preparation, review and approval of DPR (NH-22-08-2016) |
|
18 |
19-10-2016 |
Construction of Cement Concrete Pavement (NH- D547- 19-10-2016) |
|
19 |
12-05-2017 |
Delegation of Powers to Chief Engineer-Regional Officer (CE-RO) at MorT&h Regional Offices (NH-12-05-2017) |
|
Special Schemes
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
|
NREGA Saral Mate Marg Darshika (Manual) |
|
2 |
|
NREGA Task Pustika (Manual) |
|
3 |
|
National Building Code 2005 |
|
4 |
|
Retrofitting-Guidelines |
|
5 |
|
Earthquake Training manual Engineers NPCBEERM |
|
6 |
|
Satte Govt Eartquake ordrs |
|
7 |
|
Law and Legal Frame work |
|
8 |
|
IS Code for Earthquake Engineering |
|
9 |
|
Hazard Safety Cell Releief Dept orders |
|
10 |
|
Earthquakle Awarness materail |
|
11 |
09-02-2009 |
NREGS & PMGSY Convergence 9 Feb 2009 Circular |
|
12 |
06-05-2009 |
NAREGA Works (SS Circular dt.06.05.2009 ) |
|
13 |
30-09-2010 |
To reduce damages in B/T Roads in rainy season (SS Circular dt.30.09.2010 ) |
|
14 |
07-11-2013 |
GOI mgnrega__pmgsy Convergence Circular 7 Nov 2013 |
|
15 |
22-05-2014 |
NAREGA Works (SS Circular dt.22.05.2014 ) |
|
16 |
30-05-2014 |
Flood management Works (SS Circular dt.30.05.2014 ) |
|
17 |
11-11-2014 |
Hazard Safety Cell (SS Order No. CE(SS)/D-416 dt.11.11.2014 ) |
|
18 |
03-12-2014 |
Nomination of Programme in NAREGA Works (SS Order No. SE(SS) 2014/D-430 dt.3.12.2014 ) |
|
19 |
08-05-2015 |
State Govt Nrega PWD convergence guidelines dated 8-5-2015 |
|
20 |
19-08-2015 |
NREGA mate employement order dt 19 Aug 2015 |
|
21 |
20-04-2016 |
NREGS labour group measurement of work order 20 april 2016 |
|
22 |
11-05-2016 |
NREGS labour rate order 11 may 2016 |
|
23 |
26-05-2016 |
Flood circular PWD 2016 Dated 26-5-2016 |
|
Quality Control
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
24-09-2009 |
Duties of norms of testing officers. (QC Office Order No.F-21CE(SS)/PWD/EE(SI&QC)/09/D-2407 Dated 24-09-2009 ) |
|
2 |
24-09-2009 |
Norms of QC test to be conducted by various officers. (QC Circular No.F5/CE (SS)/PWD/EE (SI&QC)/Cir/09/D2408 Dated 24-09-2009 ) |
|
3 |
24-09-2009 |
Monitoring and action taken on substandard test reports.. (QC Office Order No.F-4CE(SS)/PWD/EE(SI&QC)/09D/2409 Dated 24-09-2009 ) |
|
4 |
24-09-2009 |
For effective Control on PWD laboratories (QC Office Order No.F-21CE(SS)/PWD/EE(SI&QC)/Lab /09/D2410 Dated 24-09-2009 ) |
|
5 |
24-09-2009 |
Work shop on Quality Control. (QC Office Order No.F-16CE(SS)/PWD/EE(SI&QC)/Cir/09/ D-2411 Dated 24-09-2009 ) |
|
6 |
11-12-2009 |
Book about QC control (QC Letter No F-3/CE(SS)/EE(SI&QC)/09/D-486 Dated 11.12.2009 ) |
|
7 |
09-07-2010 |
Maintenance of Inspection book & QC register (QC Office Order No. F.45/P&M-II/Circular /05/D228 Dated 9-7-2010 ) |
|
8 |
21-07-2010 |
Regarding Testing of material in Central/ Regional laboratories. (QC Office Order No.F-CE(SS)/EE(SI&QC)/D-37 Dated 21-07-2010 ) |
|
9 |
14-09-2010 |
To link QC results with original agreement file. (QC Letter No CE(SS)/SI&QC/10-11/D-55 dt.14-9-10 ) |
|
10 |
14-09-2010 |
Completion certificates (QC Letter No.CE(SS)SI&QC/10-11/D-56 Dated 14-9-2010 ) |
|
11 |
14-09-2010 |
Action against poor QC results (QC Letter No CE(SS)EE(SI&QC)2010-11/D-57 dated 14-9-2010 ) |
|
12 |
25-11-2010 |
Effective control of QC divisions (QC Letter No CE(SS)/SI&QC/2010/D-85 Dated 25-11-2010 ) |
|
13 |
01-02-2011 |
Ensuring effective quality control on works. (QC Letter No No. CE(SS)EE(SI&QC)2010-11/D97 Dated 1-2-2011 ) |
|
14 |
09-03-2011 |
Quality Control. (QC Circular No.F3CE(SS)/EE(SI&QC)/2011/1) Dated 9-3-2011 ) |
|
15 |
28-03-2011 |
Sequential procedure for finalization of ATRs. (QC Letter No Dated 28-03-2011/Udaipur ) |
|
16 |
13-04-2011 |
Utilization of 1% provision in sanctioned amount for quality control works. (QC Letter No No. F-3/CE(SS)/EE(SI&QC)/2011/D-1 Dated 13-4-2011 ) |
|
17 |
09-06-2011 |
Corrigendum for Circular No.78 Dated 09-06-2011 |
|
18 |
09-06-2011 |
Quality Control measures. (QC Circular No. CE(SS)/EE(SI&QC)/2011/D-6 Dated 09-06-2011 ) |
|
19 |
09-08-2011 |
Establishment/ verification of field Laboratory. (QC Letter No No. SE (SS)/Q.C./ 81 Dated 9-8-11 ) |
|
20 |
02-03-2012 |
Administrative control of EESI&QC. (QC Office Order CE(SS)/EE(SI&QC)/D-97 Dated 02.03.2012 ) |
|
21 |
12-03-2015 |
Synthetic Polyester Triangular Fibers (Circular No.1/2015 dated 12.3.2015) Cell (D&T) |
|
22 |
15-02-2016 |
Corrigendum for Circular of Synthetic Polyester Triangular Fiber Circular No.1/2015 dated 15.2.2016 Cell ((D&T) |
|
23 |
13-12-2016 |
Circular of Quality Assurance on Work Dated 13-12-2016 |
|
24 |
22-09-2017 |
MoM Related to Contractors Demands Dated 22-9-2017 |
|
25 |
27-09-2017 |
Circular Regarding Completion Certificate of All Works dated 27-9-2017 |
|
26 |
04-02-2019 |
Circular Regarding Quality Control Testing of works dated 04.02.2019 |
|
27 |
14-05-2018 |
Circular regarding Testing of Samples through PWD Central Lab-Regional Lab-District Labs dated 14.05.2018 |
|
28 |
15-11-2021 |
Allotment for various Old Sanctioned Works under NRHM (Excluding Ayush Wing) |
|
29 |
07-03-2022 |
Circular regarding Fixing of Norms for QC Tests/Inspection of identified works |
|
30 |
13-05-2022 |
Circular regarding Tenders of Road Works |
|
31 |
13-05-2022 |
Circular regarding Calibration Certificate of Hot Mix Plant/ Weight Batching Plant |
|
32 |
13-05-2022 |
Circular regarding inclusion of test results of QC in Original Contract File by EE (Payment Officer) |
|
33 |
13-05-2022 |
Circular regarding Inspection of DLP Roads (MDR & SH) |
|
34 |
13-05-2022 |
Circular regarding Inspection of identified work by QC Wing |
|
35 |
13-06-2022 |
Modified Format for reporting (Road and Building) IQM for inspection of works |
|
36 |
28-11-2022 |
Instructions for action against the contractors for violation of clauses of quality control related contract |
|
37 |
13.02.2023 |
Office Order of Superintending Engineer (QC) |
|
Architect
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
06-04-2002 |
Compliance of Minutes of the Meeting. (Architect Order Dt. 06.04.2002 ) |
|
2 |
01-02-2012 |
Deviations in drawing. (Architect Order No. CA/PW/2012/D-3616 Dt. 01.02.2012 ) |
|
Electrical
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
23-04-2012 |
Duties of ACE (Elect Order No.F.1(32)PW/2011 dt.23.04.2012 ) |
|
2 |
23-05-2013 |
Bid for Electrical Works (Elect Order No.136 dt.23.05.2013 ) |
|
3 |
04-06-2013 |
Forecast Estimates (Elect Circular dt.04.06.2013 ) |
|
4 |
04-06-2013 |
Adoption of Green Bldg. Measures (Elect Circular dt.04.06.2013 ) |
|
5 |
06-08-2013 |
Forecast Estimates (Elect Circular dt.06.08.2013 ) |
|
6 |
22.09.2021 |
Electric BSR-2021 |
|
7 |
22.09.2021 |
PWD BSR Electric corrigendum addemdum |
|
8 |
24.09.2021 |
Errata correction in addendum -1 BSR Electric 2021 |
|
Legal Cell
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
20-08-2016 |
कार्यालयों के गठन, आमेलन अथवा समाप्त किये जाने के उपरान्त न्यायिक प्रकरणों की पत्रावलियों के संधारण हेतु आदेश दिनांक 20/8/2016 |
|
2 |
29-08-2016 |
Directions By Hon'ble CM about work disposal by AAG Dated 29.08.2016 |
|
3 |
31-08-2016 |
Instructions By Hon'ble CS regarding inter deparmental disputes Dated 31.08.2016 |
|
4 |
20-09-2016 |
मा0 उच्च न्यायालय में अपील/रिट पर स्थगन आदेश/अंतरिम आदेशों के क्रम में परिपत्र दिनांक 20/9/2016 |
|
5 |
27/06/2019 |
Circular Regarding Court Orders and Decision |
|
Administration/Misc.
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
06-11-1995 |
Highways (General Rajasthan Highways Act,1995 ) |
|
2 |
22-01-2000 |
General Maintenance of Govt. Hospitals (General Circular No. 2/2000 ) |
|
3 |
01-02-2000 |
Inspection of Build by Superintending Engineer (Civil) (General Circular No. 3/2000 ) |
|
4 |
15-02-2000 |
Road cut by PHED/RSEB/Telephone Dept. (General Circular No. 4/2000 ) |
|
5 |
15-02-2000 |
Encroachments by const. of Mandirs and Mazars on Highways (General Circular No. 5/2000 ) |
|
6 |
22-02-2000 |
Deputation of Officers/Officials of the Dept. (General Circular No. 6/2000 ) |
|
7 |
14-09-2000 |
Post Qualification of Contactors of road building and other works in the PWD (General Order No.F.8(27)PW/95 dt.14.09.2000 ) |
|
8 |
18-04-2001 |
Potential Assessment method (General Order No. F8(27)PW/95 dt.18.04.2001 ) |
|
9 |
17-07-2001 |
Guidelines for keeping record of Bulk Bitumen (Contract Paver Work) (General Circular No. 7/2001 ) |
|
10 |
28-11-2001 |
Potential Assessment method (Amended) (General Order dt.28.11.2001 ) |
|
11 |
22-01-2002 |
The Payment of WBM work in PMGSY,CRF & NH Works (General Circulars No.1/2002 dt.22.01.2002 ) |
|
12 |
22-03-2002 |
Maintenance of Service Book (General Circular No. 8/2002 ) |
|
13 |
09-04-2002 |
2 Tier System for PMGSY/CRF/Road Up gradation Project (General Circular No. 9/2002 ) |
|
14 |
17-04-2002 |
Sanction of Annual Grade Increments to A.En. (General Circular No. 10/2002 ) |
|
15 |
30-05-2002 |
Conversion of Agriculture land (General Order No.P.2/8/RAJ/Rev/Group-9/02 dt. 30.5.2002 ) |
|
16 |
09-07-2002 |
Extension in time of Completion, Excess items and Deviation statement (General Order No.F.8(9)PW/2000/672 dt.09.07.2002 ) |
|
17 |
08-08-2002 |
Works within sanctioned budget (General Circulars of dt.08.08.2002 ) |
|
18 |
12-08-2002 |
Ceiling Rates (Bldg.& Road maintenance) (General Order No.1115 dt.12.08.2002 ) |
|
19 |
17-10-2002 |
Deputation of J.En. by ACE/SE (General Circular No. 11/2002 ) |
|
20 |
21-10-2002 |
Headquarter Leaving Permission by Collector for Famine Relief Work (General Circular No. 12/2002 ) |
|
21 |
22-11-2002 |
Inspection of Subordinate Officers ACE/SE/EE/A.En. (General Circular No. 14/2002 ) |
|
22 |
11-03-2003 |
Inauguration of new roads (General Circular dt.11.03.2003 ) |
|
23 |
08-04-2003 |
Utilization of services of Junior Engineers posted in National Highway in Famine Relief Operations (General Circular No. 2/2003 ) |
|
24 |
11-07-2003 |
Completion certificate (General Order No.CE/PWD/EE/D&T/D-134 dt.11.07.03 ) |
|
25 |
27-12-2003 |
Disposal of surplus Properties of PWD (General Circular No. 4/2003 ) |
|
26 |
19-01-2004 |
Tours/Visits of SE/EE in Jaipur (General Circular No. 1/2004 ) |
|
27 |
23-02-2004 |
Ceiling Rates for other Works expect Bluing works (General Order No.137 dt.23.02.2004 ) |
|
28 |
16-08-2005 |
Annual Grade Increment & pay fixation (General Circular No. 1/2005 ) |
|
29 |
13-01-2006 |
Approval of Tenders (General Order No.F.8(5)PW/2004/05 dt.13.01.2006 ) |
|
30 |
10-03-2006 |
Execution of work under budget provisions (General Order No. Sec.1/A/2006/92 dt.10.03.2006 ) |
|
31 |
07-08-2006 |
Conversion of Forest land (General Order No.F( )PSF/FS/06/7032 dt.07.08.06 ) |
|
32 |
17-08-2006 |
Conversion of Forest land (General Order No.PMGSY/2006/D-2057 dt. 17.08.2006 ) |
|
33 |
07-06-2007 |
Potential bids approval (General Circulars NO.F.8(27)PW/95 dt.07.06.2007 ) |
|
34 |
16-06-2007 |
Allotment of works for unemployed Degree/Diploma holders. (General Order No.F.8(13)PW/2007/D-437 dt.16.06.2007 ) |
|
35 |
14-02-2008 |
Standing council or appointment of Arbitrator (General Circular No. 1/2008 ) |
|
36 |
10-07-2008 |
RTI Acts 2005 (General Order dt.10.07.2008 ) |
|
37 |
23-07-2008 |
Reports and other general information (General Circular of dt.23.07.2008 ) |
|
38 |
03-09-2008 |
Time schedule for completion of works (General Order No.EE/NH/D-990 dt.3.09.08 ) |
|
39 |
03-09-2008 |
The time schedule for completion of work (General Order No.SE/NH/08/EE-1/D-990 dt.03.09.2008 ) |
|
40 |
09-04-2009 |
Inspection by ACE/SE/EE (General Circular No. 1/2009 ) |
|
41 |
05-05-2009 |
Amendment in Circular of dt.27.04.2009 (General Order No.SE/(PMGSY)Circulars/2009/D-4400 dt.05.05.2009 ) |
|
42 |
08-06-2009 |
Maintenance of Roads (General Circulars of dt.8.06.2009 ) |
|
43 |
21-10-2009 |
RTI Acts 2005 (General Order No.SE/PW/RT/08/D-402 dt.21.10.2009 ) |
|
44 |
10-11-2009 |
Preparation of BSR (General Order No.CE(NH)/SE(NH)/D-1203 dt.10.11.2009 ) |
|
45 |
08-12-2009 |
Rates Analysis (General Order No.F.28/Misc/Sec-3/D-1999 dt.08.12.2009 ) |
|
46 |
27-01-2010 |
Tender for toll on BOT project (General Order No.PS/PS-PWD/2010/D-28 dt.27.01.2010 ) |
|
47 |
17-02-2010 |
Memo received from AG (General Order No.P.10( )09-10/CE//Sec-13/172 dt.17.02.2010 ) |
|
48 |
25-05-2010 |
Policy for Selection of pipes for water supply. (General Circular of dt.25.05.2010 ) |
|
49 |
27-10-2010 |
Guidelines for execution of various urgent nature work (General Circular of dt.27.10.2010 ) |
|
50 |
11-04-2011 |
APAs of officers (General Order No.1(17)PW/2007 dt.11.04.2011 ) |
|
51 |
11-10-2011 |
Patch repair work with WBM/WMM (General Circular (R-1) of dt.11.10.11 ) |
|
52 |
11-01-2012 |
Quality of Bitumen (General Circular R-1/2012 dt.11.01.2012 ) |
|
53 |
05-03-2012 |
CRC of bulk Bitumen (General Circular No.01/2012 DT.05.03.2012 ) |
|
54 |
19-04-2012 |
E-Tendering (General Order No.F.7(Circular)/Sec.II/10-11/D-38 dt.19.04.2012 ) |
|
55 |
30-04-2012 |
Inspections/Tours & Night Halts of officers. (General P.14(1) PW/2012/Part-I dt.30.04.2012 Circular-I ) |
|
56 |
30-04-2012 |
Inspections of Subordinates offices. (General P.14(1) PW/2012/Part-I dt.30.04.2012 Circular-II ) |
|
57 |
14-05-2012 |
Court Cases Procedure. (General Order No.F48(Gen)PW/AS/Sec-7/D-Spl-1 dt.14.05.2012 ) |
|
58 |
06-06-2012 |
Tack coat on existing Bituminous surfaces (General Circular R-4/2012 dt.06.06.2012 ) |
|
59 |
14-06-2012 |
Damaging road surfaces (General Circular-12 dt.14.06.2012 ) |
|
60 |
27-06-2012 |
Budget for medical bills (General Order No.CE/Sec-11/P.3(90)/D-220 dt.27.06.2012 ) |
|
61 |
09-07-2012 |
Constriction of road/bldg. in catchment area (General Circular of dt.09.07.2012 ) |
|
62 |
13-07-2012 |
Traffic census (General Circular R-6/2012-13 dt.13.07.2012 ) |
|
63 |
13-07-2012 |
Damages of road berms (General Order No.533 dt.13.07.2012 ) |
|
64 |
13-07-2012 |
Execution of Construction work (General Circular dt.13.07.2012 ) |
|
65 |
13-09-2012 |
Guide lines to prepare for seeking approval under Forest- Conservation Act (FCA) 1980 (General Order No. ACE/BOT/Gen/12-13/D-2833 dt.13.09.2012 ) |
|
66 |
11-02-2013 |
Maintenance of rest house (General Order No.P-1(16)/Gen Adm/5/2009 dt.11.02.2013 ) |
|
67 |
19-02-2013 |
Meeting of tender approval committee (General Order No.PA/CE & AS/2013/D-1635 dt.19.02.2013 ) |
|
68 |
19-02-2013 |
Monitor submission of tender (General Order No.PA/CE&AS/2013/D-1636 dt.19.02.2013 ) |
|
69 |
19-02-2013 |
State Quality Monitor (General Circular No.1/2013 dt.19.02.2013 ) |
|
70 |
08-03-2013 |
Intra-dept. meeting (General Circular dt.08.03.2013 ) |
|
71 |
20-03-2013 |
Work orders for construction of buildings (General Circular No. 1/2013 ) |
|
72 |
04-06-2013 |
Forecast estimate (General Circular of dt.04.06.2013 ) |
|
73 |
01-07-2013 |
Completion of work within time (General Order No. CE/Sec-3/D-410 dt.1.07.2013 ) |
|
74 |
24-07-2013 |
Handing over the completed Government bldg. (General Circular 1/2013-14 dt.24.07.2013 ) |
|
75 |
06-08-2013 |
Forecast estimate (General Circular No.2/2013-14 ) |
|
76 |
07-08-2013 |
Damages of roads (General Order No.P-14(44)PW/2013 dt..07.08.2013 ) |
|
77 |
23-08-2013 |
Use of RBI grade 81 compound for soil stabilization (General Order No.SE(R)P&M-IV/2013/D-936 dt.23.08.2013 ) |
|
78 |
28-01-2014 |
Timely removal of the barricading material (General Circular -3 dt.28.01.2014 ) |
|
79 |
30-01-2014 |
NIB (General Circular dt.30.01.2014 ) |
|
80 |
24-02-2014 |
Submission of tenders (General Order No. CE(SS)/PA/D-946 dt.24.02.2014 ) |
|
81 |
03-04-2014 |
Disposal cases in the PWD (General Standing Order dt.03.04.2014 ) |
|
82 |
07-05-2014 |
Tender exceeds from admn & financial sanction (General Circular No.1/2014-15 dt.07.05.2014 ) |
|
83 |
09-05-2014 |
Meeting of standing committees for settlement of disputes (General Circular No.01 dt.09.05.2014 ) |
|
84 |
23-05-2014 |
Court Cases (General Order No.F48(Gen)PW/AS/Sec-7/D-1849 dt.23.05.2014 ) |
|
85 |
18-06-2014 |
Permission leave Headquarter (General Circular No. 1/2014 ) |
|
86 |
06-08-2014 |
Transfer of Gazetted/Non Gazetted (General Standing Order dt.06.08.2014 ) |
|
87 |
10-02-2015 |
Directions for sending recommendation for action under CCA-16/17 after proper examination of available facts (10-02-2015) |
|
88 |
04-03-2015 |
Diredctions for submitting all documents while sending the matter for examination of Account Wing (D-790 04-03-2015) |
|
89 |
11-03-2015 |
Directions for carrying regular/sudden Inspections in the Government Departments (AR Dated : 11-03-2015) |
|
90 |
18-03-2015 |
Directions for leaving proper space on the note-sheet prior sending the file to higher authoroties (30019 Dated " 18-03-2015) |
|
91 |
25-03-2015 |
Directions for proper examining of Bids in respect of proper documentations, procedure and Fee etc. (D-852 25-03-2015) |
|
92 |
07-04-2015 |
Directions for ignoring false calls/messages related to demand of money from unknown sources (30773 Dated 07-04- 2015) |
|
93 |
21-04-2015 |
Higher Education (Distance Education Mode) Order dated 21.4.2015 Cell Sec-I(C) |
|
94 |
24-04-2015 |
Circular for using official e-mail of Pr. Secretary PWD for submitting information about official activities by officers (D- 31268 Dated 24-04-2015) |
|
95 |
01-06-2015 |
The Evaluation of work done by the Public Sector Undertakings of Government (Finance 01-06-2015) |
|
96 |
30-06-2015 |
Tender Documents Circular No.3/2015-16 dated 30.6.2015 Cell (D&T) |
|
97 |
16-07-2015 |
Regarding Bills Circular No.4/2015 dated 16.7.2015 Cell (D&T) |
|
98 |
15-10-2015 |
Regarding Contractors Circular dated 15.10.2015 Cell (Sec-XI) |
|
99 |
01-12-2015 |
Timeline in disposing of public grievances received directly or through MPs/ VIPs and VIP/Imporatnt Offices/email etc, (MOrD 1- 12-2015) |
|
100 |
01-01-2016 |
Price Variation Clause Circular 718 Dated 01-01-2016 |
|
101 |
01-01-2016 |
Directions for preparing final bill after calculating escalation(D-718 01-01-2016) |
|
102 |
11-04-2016 |
Directions for using Online LOC Module for sending demands of fund for Building Heads (D-1 11-04-2016) |
|
103 |
12-04-2016 |
Directions for preparing final bill after calculating escalation on the basis of Excess/Saving (D-34 12-04-2016) |
|
104 |
26-05-2016 |
Preparing for Flood Management During 2016 Circular No.5/2016-17 dated 26.5.2016 Cell (D&T) |
|
105 |
15-06-2016 |
Price variation Clause Circular dated 15.6.2016 Cell (Sec-XI) |
|
106 |
02-09-2016 |
E-Precourement Circular no.540 Dated 02-09-2016 |
|
107 |
27-09-2017 |
Circular Regarding Completion Certificate of All Works No.122 Dated 27-09-2017 |
|
108 |
27-09-2017 |
Addinational Performance Security on Unbalanced Bids Dated 27.09.2017 |
|
109 |
10-10-2017 |
Registration (Enlistment) Fee and Security Deposit Order Dated 10-10-2017 |
|
110 |
16-01-2018 |
Circular regarding Compensation for Delay Dated 16.01.2018 |
|
111 |
07-02-2018 |
Circular regarding Price Variation Clause Dated 07.02.2018 |
|
112 |
27-04-2018 |
Circular regarding TDS Deduction on GST D-64 Dated - 27.4.2018 |
|
113 |
04-02-2019 |
Circular Regarding Format and Publish size of Notice Inviting Bids (NIB) dated 04.02.2019 |
|
114 |
04-02-2019 |
Circular Regarding Determination of percentage for excess/extra item dated 04.02.2019 |
|
Pradhan Mantri Gram Sadak Yojna (PMGSY)
|
Sr.No. |
Dated |
Discricption |
Remark |
1 |
17-07-2001 |
Guidelines for keeping record of Bulk Bitumen (Contract Paver Works). (PMGSY 7/2001F.78(1)/Sec.I/A/2k/D-4536 dt. 17-07-01 ) |
|
2 |
28-12-2001 |
Logo of PMGSY. (PMGSY P-17017/4/99-RC dt.28-12-01 ) |
|
3 |
22-01-2002 |
Quality Control on PMGSY works. (PMGSY F.7()/Sec.II/PMGSY Cir/D-510 dt. 22-01-02 ) |
|
4 |
22-01-2002 |
Payment of WBM work in PMGSY. (PMGSY 01/2002 (EE(D&T)/D-661) dt. 22-01-02 ) |
|
5 |
11-02-2002 |
Regarding work order amount. (PMGSY EE(R&D-II)/PMGSY/General/2001/D-862 dt. 11-02-02 ) |
|
6 |
22-02-2002 |
Use of bitumen. (PMGSY 3/2002 (F.11/Meeting/QC/EE/D&T/D-710 dt.22-02-02 ) |
|
7 |
19-03-2002 |
Quality Control on PMGSY works. (PMGSY F.7(595)Sec.II/PMGSY Cir/D-425 dt. 19-03-02 ) |
|
8 |
09-04-2002 |
Inspection of roads. (PMGSY CE/PWD/EE(M)/86 dt. 09-04-02 ) |
|
9 |
02-05-2002 |
Preparation of technical estimates. (PMGSY F.8(9)PW/2000/Pt.II/405 dt. 02-05-02 ) |
|
10 |
08-05-2002 |
Use of material for construction of sub base. (PMGSY 14/2002CE/PWD/EE(M)/218 dt. 08-05-02 ) |
|
11 |
23-05-2002 |
PMGSY work during the monsoon period. (PMGSY (R&D-II)/PMGSY/General/2001/D-1102 dt. 23-05-02 ) |
|
12 |
22-07-2002 |
To check the weight of the mix-material in transit. (PMGSY 16/2002CE/PWD/EE(M)/336 dt. 22-07-02 ) |
|
13 |
22-07-2002 |
Regarding weigh-bridges installed at plant. (PMGSY 17/2002CE/PWD/EE(M)/337 dt. 22-07-02 ) |
|
14 |
20-10-2002 |
Scrutiny of PMGSY estimated by STA. (PMGSY EE(R&D-II)/STA/D-1502 dt. 20-10-02 ) |
|
15 |
19-02-2003 |
Use of mixture machine for mixing of cement concrete. (PMGSY 3/2003CE/PWD/SE(P&D)/EE(M&QC)/-734 dt. 19-02-03 ) |
|
16 |
07-04-2003 |
Construction of road under PMGSY. (PMGSY EE(R&D-II)/PMGSY/03 dt. 07-04-03 ) |
|
17 |
03-05-2003 |
The Grading system. (PMGSY 5/2003CE/PWD/SE(P&D)/EE(M&QC)/D-01 dt. 03-05-03 ) |
|
18 |
16-05-2003 |
Preparation of detailed project report-DPR (PMGSY EE(R&D-II)/PMGSY/D-1791 dt. 16-05-03 ) |
|
19 |
30-06-2003 |
Preparation of estimates for PMGSY works. (PMGSY EE(R&D)/PMGSY/STA/08/D-1925 dt. 30-06-03 ) |
|
20 |
17-10-2003 |
CBR tests. (PMGSY 13/2003-2004 dt. 17-10-03 ) |
|
21 |
14-11-2003 |
Construction of road under PMGSY. (PMGSY EE(R&D)/PMGSY/Circular/2003/D-2106 dt.14-11-03 ) |
|
22 |
02-01-2004 |
Execution of PMGSYworks. (PMGSY EE(R&D)/PMGSY/Circular/2003 dt. 02-01-04 ) |
|
23 |
02-01-2004 |
Use of CRMB. (PMGSY CE(NH)/TA/D-2986 dt. 02-01-04 ) |
|
24 |
05-02-2004 |
Estimates for the regular allocation. (PMGSY EE(R&D-II)STA/04/D-2160 dt. 05-02-04 ) |
|
25 |
08-03-2004 |
Workshop regarding quality control of works. (PMGSY EE(P&M)/D-191 dt. 08-03-04 ) |
|
26 |
11-03-2004 |
Use of CRMB.for wearing course on roads under PMGSY. (PMGSY 1/2004SE(P&M)/D-198 dt. 11-03-04 ) |
|
27 |
27-03-2004 |
Providing specified camber on carriageways. (PMGSY 3/2004 SE(P&M)/D-218 dt. 27-03-04 ) |
|
28 |
31-03-2004 |
Construciton of road through DRDA. (PMGSY P.45/P&M-II/Circular/04/D-2449 dt. 31-03-04 ) |
|
29 |
01-06-2004 |
Construction of road under PMGSY. (PMGSY P.10( )/2/2004 dt. 01-06-04 ) |
|
30 |
06-07-2004 |
Consultation with Panchayat Institutions. (PMGSY P-14018/1/2004-NRRDA dt. 06-07-04 ) |
|
31 |
22-07-2004 |
Construction of road under PMGSY (PMGSY Order No.F.7(721)Sec.11/03/D-742 dt.22.07.2004 ) |
|
32 |
06-08-2004 |
PMGSY-Preparation of proposals for un-connected PHQs. (PMGSY F.14(3)/PW/PMGSY/Policy/2004/D-69 dt. 06-08-04 ) |
|
33 |
02-09-2004 |
Quality Control test according to norms. (PMGSY CE/PWD/QC/D-251 dt. 02-09-04 ) |
|
34 |
16-09-2004 |
Integrated Development of Rural road Network under PMGSY. (PMGSY SE(PMGSY)IDRRN/2004/D-1559 dt. 16-09-04 ) |
|
35 |
04-10-2004 |
Development and operationalisation of computerized database for rural roads in GIS. (PMGSY EE(OMMS)/PMGSY/2004/D-109 dt. 04-10-04 ) |
|
36 |
07-10-2004 |
Regarding proposals of forest clearance. (PMGSY SE(PMGSY)/Circular/04/D-1597 dt. 07-10-04 ) |
|
37 |
08-11-2004 |
Availability of revenue track for PMGSY roads. (PMGSY F.3(2)/Raj-6/2003 dt. 08-11-04 ) |
|
38 |
30-11-2004 |
Regulation of expenditure in excess of estimates approved by MoRD. (PMGSY A-12015/07/2003-NRRDA dt. 30-11-04 ) |
|
39 |
01-01-2005 |
Estimation of cost of routine maintenance activities during thecontract period 5 years for PMGSY works. (PMGSY SE(PMGSY)/OMMAS/2004/D-142 dt. 01-01-05 ) |
|
40 |
27-01-2005 |
Inspection of NQMs. (PMGSY SE(PMGSY)/NQM/2005/D-496 dt. 27-01-05 ) |
|
41 |
21-03-2005 |
Specification for concrete pavements for PMGSY roads. (PMGSY SE(PMGSY)/Circular/05/D-224 dt. 21-03-05 ) |
|
42 |
02-04-2005 |
Regarding term & conditions of contract. (PMGSY F.2(535)/Sec.14/04-05/D-375 dt. 02-04-05 ) |
|
43 |
23-04-2005 |
Regarding Standard Data Book. (PMGSY SE(PMGSY)Circular/2005/D-2224 dt. 23-04-05 ) |
|
44 |
25-04-2005 |
CBR Value. (PMGSY 2/2005 SE(PMGSY)Circular/2005/D-2234 dt. 25-04-05 ) |
|
45 |
25-04-2005 |
Detailed procedural guidelines for clearance of world Bank aided rural roads projects. (PMGSY P-17029/5/04-Pt.I dt. 25-04-05 ) |
|
46 |
14-06-2005 |
Proper cleaning of WBM surface. (PMGSY 1/2005 SE(PMGSY)Circular/D-2377 dt. 14-06-05 ) |
|
47 |
14-06-2005 |
Regarding checking of line, grade, cross fall & compaction of shoulders. (PMGSY 2/2005SE(PMGSY)Circular/D-2378 dt. 14-06-05 ) |
|
48 |
14-06-2005 |
Norms of Engineers for inspection of roads. (PMGSY 38412 SE(PMGSY)Circular/D-2379 dt. 14-06-05 ) |
|
49 |
02-07-2005 |
Environmental & social assessment mission of World Bank. (PMGSY SE(PMGSY)/WB/D-2431 dt. 02-07-05 ) |
|
50 |
30-07-2005 |
PMGSY proposals. (PMGSY EE(R&D)/D-213 dt. 30-07-05 ) |
|
51 |
01-08-2005 |
Specification for concrete pavements for PMGSY roads. (PMGSY 4/2005 SE(PMGSY)Circular/D-214 dt. 01-08-05 ) |
|
52 |
21-08-2005 |
Instruction regarding construction of road under PMGSY. (PMGSY SE(PMGSY)/Circular/05/D-225 dt. 21-08-05 ) |
|
53 |
30-08-2005 |
Role of technical examiners. (PMGSY SE(PMGSY)/WB/Circular/05/D-2640 dt. 30-08-05 ) |
|
54 |
01-09-2005 |
Adoption of Mechanical means for spreading of materials. (PMGSY 5/2005 SE(PMGSY)/WB/Circular/2005/D-2704 dt. 01-09-05 ) |
|
55 |
05-09-2005 |
Technical sanction of estimate of PMGSY works. (PMGSY 6/2005 SE(PMGSY)/WB/Circular/2005/D-236 dt. 05-09-05 ) |
|
56 |
05-09-2005 |
Technical sanction of estimate of PMGSY works. (PMGSY 6/2005 SE(PMGSY)/Circular/2005/D-236 dt. 05-09-05 ) |
|
57 |
26-09-2005 |
Bid documents for PMGSY works. (PMGSY SE(PMGSY)/WB/05/D-2725 dt. 26-09-05 ) |
|
58 |
03-10-2005 |
Attention to quality of bituminous construction under PMGSY. (PMGSY P-14018/1/2005/PIII&QM dt. 03-10-05 ) |
|
59 |
15-10-2005 |
Attention to quality of bituminous construction under PMGSY. (PMGSY EE(PMGSY)/NQM/2005/D-1182 dt. 15-10-05 ) |
|
60 |
26-10-2005 |
Required NOC for Pollution Control for Hot Mix Plant. (PMGSY EE(WB)/2005/D-2848 dt. 26-10-05 ) |
|
61 |
22-11-2005 |
Crossing of the right of the users (ROW) for construction under PMGSY. (PMGSY EE(PMGSY)NQM/2005/D-2925 dt. 22-11-05 ) |
|
62 |
20-12-2005 |
Checking of surface of PMGSY roads. (PMGSY CE/PWD/ACE(HQ)/D-444 dt. 20-12-05 ) |
|
63 |
21-12-2005 |
Transparency in execution of road works under PMGSY. (PMGSY P-17025/4/2005/P-III dt. 21-12-05 ) |
|
64 |
27-12-2005 |
Project formulation and quality monitoring. (PMGSY SE(PMGSY)/2005/D-3054 dt. 27-12-05 ) |
|
65 |
25-02-2006 |
PMGSY Dos & Dont in quality. (PMGSY 1/2006SE(PMGSY)/Circular/2006/D-3175 dt. 25-02-06 ) |
|
66 |
04-05-2006 |
Contractual Maintenance of PMGSY roads. (PMGSY 5/2006SE(PMGSY)/Circular/2006/D-115 dt. 04-05-06 ) |
|
67 |
06-01-2007 |
Visit of PMGSY roads by the engineers. (PMGSY 6/2007SE(PMGSY)/Circular/2007/D-738 dt. 06-01-07 ) |
|
68 |
14-02-2007 |
Maintenance of roads constructed under PMGSY. (PMGSY SE(PMGSY)/07/D-827 dt. 14-02-07 ) |
|
69 |
28-02-2007 |
Check list for running & final bills. (PMGSY 7/2007D-864 dt. 28-02-07 ) |
|
70 |
28-02-2007 |
Certificate for thickness of sub-base and base course. (PMGSY 8/2007 D-865 dt. 28-02-07 ) |
|
71 |
14-03-2007 |
Maintenance of roads constructed under PMGSY. (PMGSY SE(PMGSY)07/D-898 dt. 14-03-07 ) |
|
72 |
24-03-2007 |
First tier of quality management and payment of first running bill. (PMGSY SE(PMGSY)/Mics/D-917 dt. 24-03-07 ) |
|
73 |
05-04-2007 |
Norms of Engineers for inspection of roads. (PMGSY Sec.I/A/07/D-90 dt. 05-04-07 ) |
|
74 |
30-05-2007 |
Maintenance of roads constructed by PWD. (PMGSY CE/PMGSY/2007/D-1071 dt. 30-05-07 ) |
|
75 |
10-09-2007 |
Maintenance of roads constructed under PMGSY. (PMGSY SE(PMGSY)/07/D-2251 dt. 10-09-07 ) |
|
76 |
20-12-2007 |
Maintenance of roads constructed by PWD. (PMGSY F.10(P&M-II)/VR/07/561 dt. 20-12-07 ) |
|
77 |
05-03-2008 |
Maintenance of roads constructed by PWD. (PMGSY F.10(P&M-II)/VR/07/683 dt. 05-03-08 ) |
|
78 |
18-03-2008 |
Quality Control on PMGSY works. (PMGSY Order No. SE(PMGSY) Circulars/2008/D-2867 dt.18.03.2008 ) |
|
79 |
28-10-2009 |
Maintenance of roads constructed by PWD. (PMGSY D-4013 dt. 28-10-09 ) |
|
80 |
11-03-2010 |
Foundation laying / inauguration of projects under PMGSY. (PMGSY P-17025/11/10-RC dt. 11-03-10 ) |
|
81 |
16-03-2010 |
Memorandum - PMGSY regarding. (PMGSY P-17025/6/10-RC dt. 16-03-10 ) |
|
82 |
01-04-2010 |
Joint inspection and Foundation laying / inauguration of projects under PMGSY. (PMGSY P-17025/11/10-RC dt. 4/2010 ) |
|
83 |
18-05-2010 |
Inspection norms of roads under PMGSY. (PMGSY Assembly Cell/2010/D-819 dt. 18-05-10 ) |
|
84 |
22-10-2010 |
Uploading of quality grading of items / sub-items and photographs of works inspected under 2nd Tier of quality monitoring. (PMGSY P-17012/1/2009/P-III dt. 22-10-10 ) |
|
85 |
09-02-2011 |
Advisory on the submission of project proposals with long span bridges. (PMGSY P-14012/45/2004-Tech. dt. 09-02-11 ) |
|
86 |
28-04-2011 |
Left out bridges on roads already sanctioned under PMGSY. (PMGSY 4/2011 P-17017/1/2010-RC dt. 28-04-11 ) |
|
87 |
28-04-2011 |
Uploading of quality grading of items / sub-items and photographs of works inspected under 2nd Tier of quality monitoring. (PMGSY 6/2011 P-17017/1/2010-RC dt. 28-04-11 ) |
|
88 |
27-05-2011 |
Substituting of tyres of Iron-tyred Bullock Carts with Pneumatic Tyres. (PMGSY P-17017/1/2010-RC dt. 27-05-11 ) |
|
89 |
27-07-2011 |
Meeting of Gram Sabha after Transect Walk for preparation of Detailed Project Reports under PMGSY. (PMGSY 9/2011 P-17017/1/2010-RC dt. 27-07-11 ) |
|
90 |
27-07-2011 |
Participation of honble Members of Parliament in selection of eligible propalsa, joint inspection and foundation laying ceremoney under PMGSY. (PMGSY 10/2011 P-17017/1/2010-RC dt. 27-07-11 ) |
|
91 |
04-08-2011 |
Uploading the quality grading of items / sub-items and photographs of works inspected under 2nd tier of quality monitoring. (PMGSY P-17026/1/2006/P-III dt. 04-08-11 ) |
|
92 |
11-10-2011 |
Use of Saving of PMGSY works. (PMGSY SE(PMGSY)/2011/D-775 dt. 11-10-11 ) |
|
93 |
12-10-2011 |
Regarding issue of authorization. (PMGSY SE(PMGSY)/Accounts/2011/D-793 dt. 12-10-11 ) |
|
94 |
12-10-2011 |
Use of Saving of PMGSY works. (PMGSY SE(PMGSY)/2011/D-794 dt. 12-10-11 ) |
|
95 |
09-01-2012 |
Detailed Project Reports for PMGSY sanctions - Submission in PDF format in DVDs regarding. (PMGSY P-17017/1/2010-RC dt. 09-01-12 ) |
|
96 |
31-01-2012 |
Provision of plantation work in the DPRs of PMGSY proposals. (PMGSY SE(PMGSY)/2011/D-2488 dt. 31-01-12 ) |
|
97 |
23-04-2019 |
Regarding PMGSY Roads Maintenance Register circular no.1/2019-2020 dt.23-04-2019 |
|
98 |
24-04-2019 |
विधान सभा जनलेखा समिति 2018-19 के 265 वें प्रतिवेदन की सिफारिश संख्या 5 के क्रियान्वयन बाबत परिपत्र 02/2019-20 दिनांक 24/04/2019 |
|
99 |
24-04-2019 |
विधान सभा जनलेखा समिति 2018-19 के 265 वें प्रतिवेदन की सिफारिश संख्या 2 के क्रियान्वयन बाबत परिपत्र संख्या 03/2019-20 दिनांक 24/04/2019 |
|
100 |
06-08-2021 |
Revision/Addendum/deletion of Items in Unified PMGSY BSR |
|
|
|
|
|